Laserfiche WebLink
likely. Sparse vegetative cover has established on some of the reclaimed disturbed areas, but <br />not on all. <br />The lower water tank bench was recently disturbed for drilling. The clean water diversion was <br />disturbed by the drilling operations and needs to be restored. Seeding of the area has not <br />occurred since the structures have yet to be placed on the site. Erosion control measures will <br />have to be maintained during all phases of construction until vegetation has fully established. <br />Topsoil Pile #2 — This area is an active small area exemption. No material has been added to the <br />existing stockpile recently. Topsoil markers are in place and the pile has good vegetative cover. <br />Topsoil Stockpile #1 and Subsoil Stockpile #1 —This area is an active small area exemption. The <br />material to be placed here will come from the Bates Portal development. <br />East Side of Development Coal Waste Pile —This is an isolated area located between the disturbed <br />area drainage ditches. Area has been reclaimed for more than 15 years. Vegetative cover has <br />established well and has established shrub growth. <br />Explosives Area (Cap and Powder House) — Cap and powder house is located upstream of the clean <br />water diversion. Silt fence was utilized until vegetation could establish. Area has been reclaimed <br />for 10 years and has good vegetative cover. <br />Reclaimed Contaminated Topsoil Area — A berm was constructed between the contaminated soil <br />area and the river. The area has been reclaimed and vegetation is beginning to establish. <br />