Laserfiche WebLink
Pt 1`1' <br />U. S. DEPT. OF THE INTERIOR Io -w-{. <br />OFFICE OF SURFACE MINING <br />Mine Site Evaluation <br />State Program <br />1. Person/Permittee <br />NEW ELK COAL COMPANY, LLC <br />2. Address <br />122 W 1ST ST <br />3. City <br />TRINIDAD <br />5. Zip Code <br />81082 <br />7. Operator Name (if different than Permittee) <br />8. Mine Name <br />25. Hours <br />4.00 <br />8.001 <br />6.001 <br />3.001 <br />a. Permit Review <br />b. Site Visit Time <br />c. Travel Time <br />d. Report Writing <br />\ r ` \ 4:09 <br />6. Phone Number <br />4. State <br />CO <br />(719) 845 - 0090 <br />NEW ELK MINE <br />26. Suture Block <br />Signature <br />Christy Hulsman ID # 532 <br />Date: <br />Printed Name <br />1 09/09/2011 <br />9. Permit Number <br />1 C- 012 -81 <br />11. Field Visit Date 12. Pu .ose <br />06/07/2011 <br />mm -dd - yyyy <br />14. Permit Status <br />I A <br />17 OSM Office # <br />1140 <br />20 M.S.H.A. ID # 21.State Code <br />05 -00296 <br />103972 <br />15. Site Status <br />18. CCID # <br />I CO <br />23. AVS Permittee Enity ID Number <br />10. Permit Type <br />PP <br />13 SRA Present <br />FYI <br />16. Facility Type <br />BEF <br />19. Land Code <br />S <br />22. County Name <br />LAS ANIMAS <br />24. State Office <br />27. Reviewi <br />Review Date: <br />COP I <br />Is Supplemental MSE Page Used Y ?N <br />Permit Type - Item 10 IP = Interim Program, PP = Permanent Program , NP = No Permit <br />Purpose Type Codes - Item 12 <br />Oxx... Oversight <br />Axx... Assistance <br />RFx... Reclamation Fees <br />Fxx... Federal Actions <br />CCR... Citizen Compliant Referral (non site <br />CC" Citizen Complaint (initial site visit) <br />CCF Citizen Complaiont follow -up <br />Joint Inspection - Item 13 A joint inspection is when a state inspector accompanies an OSM inspector any time during the review of the mine site. <br />Permit Status - Item 14 <br />A.... Active: Coal mining and reclamation activities occurring or <br />permitted but not yet disturbed. <br />IN... Inactive (Permanent Program Permit): Phase II completed or <br />Temporary Cessation of Operations. (Interim Program Permit) <br />Coal mining completed and reclamation activities initiated <br />BR.. Bond Release: Reclamation completed and State Regulatory <br />Authority (RA) has released all of the bond (Phase III Release.) <br />AB.... Abandoned: All surface and underground coal mining activities have ceased and <br />operator has left the site without completing reclamation as defined in <br />30 CFR 840.11(g) <br />AB1.. Bond Forfeiture: Bond forfeiture officially in process or completed, and <br />reclamation in progress or not yet commenced. <br />AB2.. Partially Reclaimed Forfeiture: Forfeited site where all bonds have been used to <br />reclaim site, but site not reclaimed to Program standards. <br />AB3.. Reclaimed Forfeiture: Forfeited site that has been reclaimed to Program standards. <br />NA.... Not Applicable: When site is unpermitted. <br />Site Status Codes - Item 15 <br />ND.. No Disturbance: No coal mining and reclamation <br />operations have been started. <br />EX.. Coal Exploration: Coal exploration operations <br />have started and where coal mining operations <br />have not begun. <br />AP.. Active Coal Producing: Coal surface mining <br />activities are occurring <br />AN.. Active Non - Producing: Active non - producing <br />facility such as tipple or preparation plant. <br />NM.. No Mining: The Permit Status is active, site is <br />not in Temporary Cessation, no surface coal <br />mining activity, and site not regraded. <br />MC.. Mining Complete: No mining activity on site, site <br />regraded and awaiting phase bond release. <br />TC.. Temporary Cessation: The RA has granted <br />cessation of mining pursuant to 30 CFR 816/ <br />817.131(b). <br />P1... Phase I Release: At least Phase I bond release <br />granted for entire permitted area. For interim <br />permits, partial bond release. <br />P2... Phase II Release: At least Phase 11 bond release <br />for the entire permitted area. <br />P3... Phase III Release: Reclamation completed and <br />the RA has released all bond. <br />NS.. Non -Site Visit: Status of site not determined. <br />FP.. Forfeiture Pending: The RA is pursuing <br />actions to revoke the permit, collect the <br />performance bond(s), and /or reclama- <br />tion of forfeited site is in progress. <br />FR.. Forfeited and Reclaimed: Forfeiture <br />reclamation completed. <br />FO.. Abandoned Site: Abandoned site that is <br />permitted but there is no bond. <br />WC. Wildcat: Coal mining and reclamation <br />operations have or are taking place and the <br />activity is not covered by the required <br />permits from the RA. <br />Facility Type Codes - Item 16 <br />A... Surface <br />B... Underground <br />C... Preparation Plant <br />D... Ancillary (Haulroad, Conveyor, and /or Rails) <br />E... Refuse and /or Impoundment <br />F... Loading Facility and /or Tipple <br />G... Stockpiles <br />H... Exploration Permits L.. Remining site permitted <br />I... Notice of Intent to Explore under 30CFR785.25 <br />J... Exempt 16 and 2/3 <br />K.. Government Financed Construction Exemption <br />Small Business Regulatory Enforcement Fairness Act (SBREFA) Your Comments Are Important <br />The Small Business and Agriculture Regulatory Enforcement Ombudsman and 10 Regional Fairness Boards were established to receive comments from <br />small businesses about Federal agency enforcement actions. The Ombudsman will annually evaluate the enforcement activities and rate each agency's <br />responsiveness to small business. If you are a small business (a business with 500 or fewer employees including those of affiliates) <br />and wish to comment on the enforcement or compliance activities of OSM, call 1- 888 -REG -FAIR (1- 888 -734- 3247). <br />I Page 1 of <br />Rcvised October 1, 2010 <br />