My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-10-18_REVISION - M1981185 (4)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981185
>
2011-10-18_REVISION - M1981185 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:58:23 PM
Creation date
10/19/2011 8:06:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981185
IBM Index Class Name
REVISION
Doc Date
10/18/2011
Doc Name
Revised supplemental response to 5th adequacy letter (CN-01)
From
GreenbergTraurig (for Wildcat Mining Corp.)
To
DRMS
Type & Sequence
CN1
Email Name
WHE
TC1
DB2
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Wallace H. Erickson <br />Revised Supplemental Response to Fifth Adequacy <br />October 18, 2011 <br />Page 2 <br />7. Exhibit D, Attachment D -6, Figure D -1, Payday and Idaho Mill Claim <br />Site Pre - Application Topography <br />8. Exhibit D, Attachment D -6, Figure D -2, Payday and Idaho Mill Claim <br />Site Augmentation Pond <br />9. Figure F -1, May Day No. 1, Reclamation Topography <br />10. Figure F -2, May Day East, Reclamation Topography <br />11. Figure F -3, May Day No. 2, Reclamation Topography <br />12. Figure F -4, Payday and Idaho Mill Site, Reclamation Topography <br />13. Figure F -5, May Day No. 3, Reclamation Topography <br />14. Figure F -5A, Chief Portal Little Deadwood Gulch, Reclamation <br />Topography. <br />Wildcat has attached a revised copy of each of these maps, and hereby withdraws <br />the maps submitted on September 27, 2011. <br />Please note also that in its October 11, 2011 Response to Sixth Adequacy, <br />Wildcat submitted copies of the following from the above list: <br />1. Exhibit D, Attachment D -2, Figure D -1, May Day No. 1 Surface <br />Facilities <br />2. Exhibit D, Attachment D -2, Figure D -2, May Day No. 1 Portal Repair <br />and Stormwater Control Plan <br />3. Exhibit D, Attachment D -6, Figure D -2, Payday and Idaho Mill Claim <br />Site Augmentation Pond <br />4. Figure F -3, May Day No. 2, Reclamation Topography <br />5. Figure F -5A, Chief Portal Little Deadwood Gulch, Reclamation <br />Topography. <br />Wildcat hereby withdraws the versions of these maps submitted on October 11, <br />2011. The revised versions of these maps attached to this Revised Supplemental <br />Response constitute Wildcat's formal, corrected submittal for these maps. <br />As always, please do not hesitate to call me, Penfield Tate at (303) 685 -7442, or <br />George Robinson at (720) 641 -2534, with any questions or concerns. <br />DEN 97, 635, 468v1 10 -18 -11 <br />GREENBERG TRAURIG, LLP 0 ATTORNEYS AT LAW m WWW.GTLAW.COM <br />
The URL can be used to link to this page
Your browser does not support the video tag.