Laserfiche WebLink
Table 1 <br />Lafarge West Inc. <br />Eagle Pit, M -80 -136 <br />Substitute. Water Supply Plan - Consumptive Use <br />Exposed Water Surface = <br />Annual Precipitation= <br />Gross Annual Evaporation = <br />3.5 <br />14.0 <br />41.5 <br />acres <br />inches <br />inches <br />Total Material Mined = <br />Moisture Content = <br />Dust Control = <br />10 <br />4.0% <br />16.0 <br />Notes <br />(1) Taken from State Engineer's Guidelines for Gravel Pits at elevations above 6500 feet. <br />(2) Gross annual evap. estimated using NOAA Technical Report NWS 33 Map 3. Column (1) * Gross Annual Evaporation / 12 inches <br />(3) Annual precipitation estimated using CDSS isohyets. Monthly distribution estimated using Western Regional Climate Center Eagle FFA Station 052454 (1949 -1994) averages. <br />(4) Column (3) * 70% / 12 inches <br />(5) Column (2) - Column (4) <br />(6) Column (5) * Exposed Water Surface <br />(7) Projected mining schedule provided by Lafarge <br />(8) Column (7) * 4% * 32.05 * 0.00002296 <br />(9) Projected dust control schedule <br />(10) Projected domestic use for employees <br />(II) Columns(8 +9 +10) <br />tons <br />ac -ft <br />�Applega"te <br />Group. <br />Date: 5/9/2011 <br />N 109107 Lafarge West Slope SWSPsO isciplines (Technicel9WRPM\Water Rights\SWSPs\Engle SW51'12011 SWSP RenewnlV:ngle Pit 2011 SWSP.xls <br />Evaporative Consumptive Use <br />Operational Consumptive Use <br />( <br />( <br />- ( <br />( <br />(5). <br />(6) <br />_.. (7). <br />(8) <br />(9) <br />(10) <br />(11) <br />Percent of <br />Annual <br />Evaporation <br />Gross Lake <br />Evaporation <br />P <br />(ft) <br />Precipitation <br />(in) <br />Effective <br />Precipitation <br />P <br />(ft) <br />Net Lake <br />Evaporation <br />P <br />(ac- ft/ac) <br />Total Lake <br />Evaporation <br />P <br />(ac-ft) <br />Aggregate <br />Production <br />(tons) <br />Water Retained in <br />Product <br />(ac -ft) <br />Water Used for <br />Dust Control <br />(ac -ft) <br />Domestic Use <br />(ac -ft) <br />Total Operational <br />Consumptive Use <br />P <br />(ac -ft) <br />January <br />1.0% <br />0.03 <br />1.10 <br />0.06 <br />0.00 <br />0.00 <br />0 <br />0 <br />0 <br />0 <br />0.00 <br />February <br />3.0% <br />0.10 <br />0.79 <br />0.05 <br />0.06 <br />0.20 <br />0 <br />0 <br />0 <br />0 <br />0.00 <br />March <br />6.0% <br />0.21 <br />1.06 <br />0.06 <br />0.15 <br />0.51 <br />0 <br />0 <br />0 <br />0 <br />0.00 <br />April <br />9.0% <br />0.31 <br />1.07 <br />0.06 <br />0.25 <br />0.87 <br />0 <br />0 <br />1.45 <br />0.001 <br />1.45 <br />May <br />12.5% <br />0.43 <br />1.10 <br />0.06 <br />0.37 <br />1.29 <br />32,500 <br />0.96 <br />1.45 <br />0.001 <br />2.41 <br />June <br />15.5% <br />0.54 <br />1.12 <br />0.07 <br />0.47 <br />1.65 <br />32,500 <br />0.96 <br />2.44 <br />0.001 <br />3.40 <br />July <br />16.0% <br />0.55 <br />1.60 <br />0.09 <br />0.46 <br />1.61. <br />32,500 <br />0.96 <br />2.44 <br />0.001 <br />3.40 <br />August <br />13.0% <br />0.45 <br />1.36 <br />0.08 <br />0.37 <br />1.30 <br />32,500 <br />0.96 <br />2.41 <br />0.001 <br />3.37 <br />September <br />11.0% <br />0.38 <br />1.44 <br />0:08 <br />0.30 <br />1.04 <br />0 <br />0 <br />2.17 <br />0.001 <br />2.17 <br />October <br />7.5% <br />0.26. <br />1.24 <br />0.07 <br />0.19 <br />0.65 <br />0 <br />0 <br />1.94 <br />0.001 <br />1.94 <br />November <br />4.0% <br />0.14 <br />0.96 <br />0.06 <br />0.08 <br />0.29 <br />0 <br />0 <br />1.69 <br />0.001 <br />1.69 <br />December <br />1.5% <br />0.05 <br />1.17 <br />0.07 <br />0.00 <br />0.00 <br />0 <br />0 <br />0 <br />0 <br />0.00 <br />Total <br />100% <br />3.46 <br />14.00 <br />0.82 <br />2.69 <br />"9.41 <br />130,000 <br />3.83 <br />16.00 <br />0.01 <br />19.84 <br />Table 1 <br />Lafarge West Inc. <br />Eagle Pit, M -80 -136 <br />Substitute. Water Supply Plan - Consumptive Use <br />Exposed Water Surface = <br />Annual Precipitation= <br />Gross Annual Evaporation = <br />3.5 <br />14.0 <br />41.5 <br />acres <br />inches <br />inches <br />Total Material Mined = <br />Moisture Content = <br />Dust Control = <br />10 <br />4.0% <br />16.0 <br />Notes <br />(1) Taken from State Engineer's Guidelines for Gravel Pits at elevations above 6500 feet. <br />(2) Gross annual evap. estimated using NOAA Technical Report NWS 33 Map 3. Column (1) * Gross Annual Evaporation / 12 inches <br />(3) Annual precipitation estimated using CDSS isohyets. Monthly distribution estimated using Western Regional Climate Center Eagle FFA Station 052454 (1949 -1994) averages. <br />(4) Column (3) * 70% / 12 inches <br />(5) Column (2) - Column (4) <br />(6) Column (5) * Exposed Water Surface <br />(7) Projected mining schedule provided by Lafarge <br />(8) Column (7) * 4% * 32.05 * 0.00002296 <br />(9) Projected dust control schedule <br />(10) Projected domestic use for employees <br />(II) Columns(8 +9 +10) <br />tons <br />ac -ft <br />�Applega"te <br />Group. <br />Date: 5/9/2011 <br />N 109107 Lafarge West Slope SWSPsO isciplines (Technicel9WRPM\Water Rights\SWSPs\Engle SW51'12011 SWSP RenewnlV:ngle Pit 2011 SWSP.xls <br />