My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-10-17_HYDROLOGY - M1980136
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1980136
>
2011-10-17_HYDROLOGY - M1980136
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:44:04 PM
Creation date
10/19/2011 7:30:30 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980136
IBM Index Class Name
HYDROLOGY
Doc Date
10/17/2011
Doc Name
SWSP
From
OSE
To
Applegate Group, Inc.
Permit Index Doc Type
Hydrology Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Division has identified four approaches for operators: <br />1. File a financial warranty that will ensure backfilling of the pit to cover the exposed ground water to a <br />depth of two feet above the static ground water level or <br />2. Obtain a court approved augmentation plan prior to exposing ground water or, <br />3. File a financial warranty to cover the cost of installing a clay liner or slurry wall that meets the <br />Division of Water Resources requirements for preventing ground water exposure or, <br />4. Obtain approval from the Division of Water Resources:that acknowledges compliance with the,SEO's <br />requirements pursuant to § 37- 90- 137(11). <br />The Division will work with operators on an Individual basis as they move to implement one of these plans. it <br />Is likely that options 1 and 3 will require, the submittal of a technical revision oran amendment to.the,exlsting <br />permit depending on the,nature;of the current mining and reclamation plan an d, the;proposed changes -- , <br />increased, financial as aresult of these modifications, may posted In a phased manner not to <br />exceed three,years. Amendments or evi <br />rsion currently under.revlew wHl be,requ to be approved by . <br />April 30, 2011 and may use the phased financial warranty,approach . described above ,New applications going <br />forward or, presently,under.review by the Divlsionwill be required topeet the requirernents ofathe . . <br />options 14 at t he time of applicat approval _ Failure of affected ope t o initiate contact with the <br />Division and gain compliance as described above could result in an enforcement action being issued b y the <br />Division. <br />If you have any questions, please contact Tony,Weldron at 303 -860567, extension 8150, <br />
The URL can be used to link to this page
Your browser does not support the video tag.