My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-10-17_REPORT - C1996083 (3)
DRMS
>
Day Forward
>
Report
>
Coal
>
C1996083
>
2011-10-17_REPORT - C1996083 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:44:05 PM
Creation date
10/18/2011 10:15:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
REPORT
Doc Date
10/17/2011
Doc Name
3rd Quarter 2011 Wastebank
From
J.E. Stover & Associates, Inc
To
DRMS
Permit Index Doc Type
Waste Pile/Fill Report
Email Name
JJD
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
September 29, 2011 <br />Bowie Resources, LLC <br />Attn: Bill Bear <br />P.O. Box 483 <br />Paonia, CO 81428 <br />Inclinometers <br />Bowie Gob Pile 2 Instrumentation Monitoring 3rd Qtr 2011.doc <br />Project #05- 126 -GEO <br />Page 1 of 4 <br />Civil, Structural & Geotechnical Engineers <br />222 South Park Ave. ^ Montrose, CO 81401 <br />Ph.: (970) 249 -6828 • FAX: (970) 249 -0945 <br />RE: BOWIE COAL WASTE DISPOSAL AREA NO. 2 <br />SUBJECT: SUMMARY OF INSTRUMENTATION MONITORING, 3rd QUARTER 2011 <br />Dear Bill, <br />Buckhorn Geotech, Inc. (BGI) has conducted on -going monitoring of inclinometers and vibrating <br />wire piezometers previously installed at Coal Waste Disposal Area No. 2 (CWDA No. 2) for <br />Bowie Resources, LLC (Bowie). In 2005, three inclinometers were installed to monitor <br />movement of placed refuse and five vibrating wire piezometers were installed to monitor pore <br />pressures developed within the coal refuse. Installation details of the instrumentation are <br />presented by BGI (2006). Three additional vibrating wire piezometers were installed in June <br />2009. This letter summarizes instrumentation monitoring at CWDA No. 2 through March 16, <br />2011. <br />Three inclinometers, designated BG05 -4, -5, and -7, were installed at CWDA No. 2 in August <br />2005. The inclinometers were installed through the coal refuse and approximately 20 feet into <br />the native foundation soils. Locations of the inclinometers are presented in Table 1 and on the <br />attached site plan. Baseline readings were taken on 8/10/05 and subsequent readings have <br />generally been taken quarterly. Cumulative displacement curves with respect to the baseline <br />readings are presented as an attachment to this letter for each inclinometer. Axis "A" reflects <br />deformation with depth in the direction of anticipated movement, while Axis "B" is orthogonal to <br />Axis A. During our site visit on September 22, 2011 to read the instruments, we noted that <br />Inclinometers BG05 -4, and BG05 -05, which were unreadable during our June 2011 visit, had <br />been repaired. Readings were therefore taken at inclinometers BG05 -04, 05 and 07 and are <br />reported herein. <br />Based on our latest readings, no definite indications of deep- seated instability of the gob are <br />observed in the inclinometer monitoring data. As described in previous letters, displacements <br />indicated on the plots for the upper ten feet of the inclinometers are attributed to placement of <br />cover soil on the face of the waste bank in late 2006 /early 2007. Movement previously <br />recorded in the B -axis of inclinometer BG05 -05 has not progressed since the December 2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.