Laserfiche WebLink
Project: <br />Bowie Mine Gob Pile Stability <br />Civil, <br />CONSTRUCTION <br />-- <br />Client / On Site Rep: <br />Bowie Resources / B. Bear <br />BUCKHOR ` GEOTECH <br />- _ - <br />Structural & Geotechnlcal <br />222 South Park Ave. • Montrose, <br />Ph.: (970) 249 -6 828 • FAX: (970) <br />MATERIALS TESTING <br />__.._.....__,_._....._ <br />81401 <br />LABORATORY <br />- <br />Engineers <br />CO <br />249.0945 <br />Contractor / Rep: <br />Bowie Resources / Gary Harding <br />; Pro j ect No: Date: <br />2005126 - CMT 9/13/2011 <br />Technician: <br />J. Harshman <br />DAILY COMPACTION REPORT <br />TEST <br />NUMBER <br />LOCATION <br />GRADE ELEI <br />TEST TYPE <br />MAX DRY <br />DENSITY <br />(pcf) <br />OPTIMUM <br />MOISTURE <br />CONT. ( %) <br />DRY <br />DENSITY <br />(pcf) <br />MOISTURE <br />CONTENT <br />(%) <br />PERCENT <br />COMPACTION <br />NOT <br />WITHIN <br />SPEC <br />SOIL <br />TYPE <br />LAB SAMPLE <br />NUMBER <br />NUC <br />SAND <br />544 <br />Pt. #4692 (N.19643.65/E:37734.37) <br />6138.6 <br />X <br />93.5 <br />12.6 <br />85.1 <br />17.8 <br />90.9 <br />544 r/c @6% <br />545 <br />Pt. #4693 (N :19760.20/E:37667.75) <br />6152.5 <br />X <br />87.5 <br />13.3 <br />72.5 <br />19.4 <br />82.0 <br />X <br />419 r/c @16% <br />546 <br />Pt. #4694 (N :19707.34/E :37563.06) <br />6151.8 <br />X <br />85.8 <br />14.8 <br />78.1 <br />12.2 <br />90.9 <br />489/490 r/c @18% <br />547 <br />Pt. #4695 (N :19608.48/E:37556.04) <br />6145.8 <br />X <br />97.7 <br />10.7 <br />80.8 <br />10.5 <br />82.7 <br />X <br />330/335 r/c @19 <br />548 <br />Pt. #4696 (N:19487.36/E:37324.83 <br />6140.3 <br />X <br />104.9 <br />10.1 <br />95.7 <br />13,0 <br />91.3 <br />334/335 r/c @21% <br />549 <br />Pt. #4697 (N:19505.79/E:37177.88) <br />6141.9 <br />X <br />97.8 <br />10.1 <br />88.0 <br />13.4 <br />90.0 <br />370/380 r/c @17% <br />MOISTURE / DENSITY SPECIFICATIONS <br />OBSERVATION / TESTING <br />FIELD OBSERVATIONS <br />;Specified <br />=Compaction Cohesive Soils <br />Requirement: 90% Cohesionless Soils <br />X <br />Full Time: <br />Part Time: <br />Number of Site Visits /Day: J <br />Testing Only: : <br />Requested By (Company Name): <br />Bowie Resources <br />Date: <br />Day: <br />Weather: <br />Temp: <br />Wind: <br />Humidity: <br />13/2011 <br />Compaction Equipment <br />Sheepsfoot: <br />` <br />Smooth Drum Roller: <br />Vibratory: <br />Other (List Below): <br />Used: <br />J <br />S <br />M <br />i- X <br />W <br />Th <br />F <br />S <br />J X <br />J <br />Sun <br />Clear <br />X <br />Overcast <br />Rain <br />Snow <br />cat 815 <br />Specified <br />Moisture Cohesive Soils <br />Requirement: n/a <br />Cohesionless Soils <br />X <br />f <br />1 <br />I <br />To 32 <br />32 -50 <br />50 -70 <br />70 - 85 <br />X <br />85 Up <br />I <br />X <br />J <br />Still <br />X <br />Mod <br />High <br />Laboratory Testing ASTM Cohesive Soils <br />=: Procedure: D -698 <br />Cohesionless Soils <br />X <br />Dry <br />X <br />Mod <br />Humid <br />DENSITY / COMPACTION TESTING WAS NOT PERFORMED <br />ON THIS DATE FOR THE FOLLOWING REASONS: <br />Insufficient amount <br />of material placed. <br />Informed (Rep of Company) of Test Results: <br />Ron Grimland <br />Buckhorn was <br />to our arrival <br />contractor would <br />on <br />PAGE 1 OF <br />not informed prior <br />on site that the <br />not be working <br />this date. <br />Contractor Not <br />Inclement Weather: <br />Equipment Malfunction: <br />Unknown: <br />Working Due To: <br />The Contractor Is: <br />Processing Frozen Material: <br />Stripping and /or Grubbing: <br />Stockpiling Fin: <br />Wet Material: <br />Conditioning Dry Mat'l: <br />Unsuitable Mad: <br />Field Copies Given <br />Contractor: <br />Client: <br />CM /GM: <br />Other: <br />To: <br />Processing <br />I <br />Moisture <br />1 <br />f 'Removing <br />05 -126 -CMT Bowie Mine No. 2 Gob Pile Stability 2009+.xls DCR9- 13 -11jh #544 <br />