Laserfiche WebLink
Project: <br />Client / On Site Rep: <br />Bowie Resources / B. Bear <br />BUCKHOR GEOTECH 1 <br />Bowie Mine Gob Pile Stability - - -______. _._____.______.-- _.____._ -._._. ____..--- ....__... <br />Civil, Structural & Geotechnicai Engineers <br />222 South Park Ave. • Montrose, co 81401 <br />Contractor / Rep: <br />Bowie Resources / Gary Harding <br />Technician: <br />J. Harshman <br />Project No: <br />2005126 - CMT <br />Date: Ph.: (970) 249 -6828 • FAX: (970) 249 -0945 <br />8/23/2011 CONSTRUCTION MATERIALS TESTING LABORATORY <br />DAILY COMPACTION REPORT <br />EST <br />NUMBER <br />LOCATION <br />GRADE ELEV <br />TEST TYPE <br />MAX DRY <br />DENSITY <br />(pcf) <br />OPTIMUM <br />MOISTURE <br />CONT. (%) <br />DRY <br />DENSITY <br />(pd) <br />MOISTURE <br />CONTENT <br />( <br />PERCENT <br />COMPACTION <br />NOT <br />wrrNIN <br />SPEC <br />SOIL <br />TYPE <br />LAB SAMPLE <br />NUMBER <br />NUC <br />SAND <br />I 527 <br />Pt. #4675 (N:19562,92/E:37247.55) <br />6148.5 <br />X <br />98.6 <br />11.0 <br />89.3 <br />12.9 <br />90.3 <br />417/418 r/c @18.4% <br />528 <br />Pt. #4676 (N :19506.12/E:37301.39) <br />6142.7 <br />X <br />98.1 <br />10.8 <br />88.5 <br />16.2 <br />90.3 <br />350 r/c @12.9% <br />529 <br />Pt. #4677 (N:19579.33/E:37430.79) <br />6148.9 <br />X <br />96.0 <br />10.4 <br />86.6 <br />15.2 <br />90.2 <br />339/3408 r/c 013.2W <br />530 <br />Pt. #4678 (N:19565.12/E:37877.76) <br />6101.0 <br />X <br />96.7 <br />11.2 <br />87.5 <br />19.2 <br />90.5 <br />337/338 r/c @11.6 <br />531 <br />Pt. #4679 (N :19494.30/E:37769.52) <br />6102.2 <br />X <br />97.2 <br />10.9 <br />89.5 <br />9.5 <br />92.2 <br />350 r/c @9.1% <br />x <br />E <br />� <br />MOISTURE / DENSITY SPECIFICATIONS <br />OBSERVATION / TESTING <br />FIELD OBSERVATIONS <br />Specified <br />Compaction Cohesive Soils X <br />Requirement: 90% Cohesionless Soils <br />Date: 8/23/2011 <br />Compaction Equipment Used: <br />Day: <br />S <br />M <br />I- X <br />W <br />Th <br />F <br />S <br />Full Time: <br />I <br />Sheepsfoot: I X <br />Weather: <br />Temp: <br />Wind: <br />Humidity: <br />Sun <br />Clear <br />X <br />Overcast <br />Rain <br />Snow <br />Part Time: I <br />Smooth Drum Roller: 1 I <br />Specified <br />Moisture Cohesive Soils X <br />Requirement: n / a Cohesionless Soils <br />To 32 <br />32 -50 <br />50 -70 <br />70 -85 <br />X <br />85 Up <br />Number of Site Visits /Day: I <br />Vibratory: I <br />Still <br />X <br />Mod <br />High <br />Testing Only: I X <br />Other {List Below): 1 I <br />Requested By (Company Name): <br />Bowie Resources <br />Laboratory Testing ASTM D- Cohesive Soils X <br />Procedure: 698 <br />Cohesionless Soils <br />Dry <br />X <br />Mod <br />Humid <br />DENSITY / COMPACTION TESTING WAS NOT PERFORMED <br />ON THIS DATE FOR THE FOLLOWING REASONS: <br />Insufficient amount <br />Informed (Rep of Company) of Test Results: <br />Ron Grimland <br />Buckhorn was not informed prior <br />to our arrival on site that the <br />contractor would not be working <br />on this date. <br />of material placed. <br />Contractor Not Working Due To: <br />The Contractor Is: <br />Field Copies Given To: <br />Contractor: <br />Inclement Weather: <br />Processing Frozen Material: <br />Processing Wet Material: <br />I <br />Client: <br />Equipment Malfunction: <br />Stripping and /or Grubbing: <br />Moisture Conditioning Dry Mat'i: <br />CM /GM: <br />PAGE 1 OF 1 <br />Unknown: <br />Stockpiling Fill: I <br />Removing Unsuitable Mall: <br />Other: <br />05 -126 -CMT Bowie Mine No. 2 Gob Pile Stability 2009 -.xls DCR8- 23 -11jh #527 <br />