Laserfiche WebLink
Project: <br />Bowie Mine Gob Pile Stability <br />Civil, <br />CONSTRUCTION <br />-- <br />-..... <br />Client Client / On Site Rep: <br />Bowie Resources / B. Bear <br />BUCKHOR <br />-____......_.. ._...____..._...__...._.. <br />Structural <br />222 South Park <br />Ph.: (970) 249-8828 <br />MATERIALS <br />GEOTECH <br />; <br />_____. <br />81401 <br />LABORATORY <br />- - -.._ r_.__- __._.._ <br />& Geotechnicai Engineers <br />Ave.. • Montrose, CO <br />• FAX: (970) 249.0945 <br />TESTING <br />Contractor / Re <br />Bowie Resources I Gary Harding <br />I Project No: <br />2005126 - CMT <br />Date: <br />8/16/2011 <br />Technician: <br />J. Harshman <br />DAILY COMPACTION REPORT <br />TEST <br />NUMBER <br />LOCATION <br />GRADE ELEV <br />TEST TYPE <br />MAX DRY <br />DENSITY <br />(pcf) <br />OPTIMUM <br />MOISTURE <br />CONT. ( %) <br />DRY <br />DENSITY <br />(pcf) <br />MOISTURE <br />CONTENT <br />( %) <br />PERCENT <br />COMPACTION <br />NOT <br />WITHIN <br />SPEC <br />SOIL <br />TYPE <br />LAB SAMPLE <br />NUMBER <br />NUC <br />SAND <br />511 <br />Pt. #4659 (N:19261.0/E:37711.84) <br />6067.0 <br />X <br />81.2 <br />16 <br />80.2 <br />15.4 <br />98.7 <br />498/490 r/c @9 <br />512 <br />Pt. #4660 (N:19190.11/E:37741.96) <br />6065.5 <br />X <br />85.4 <br />13.8 <br />80.3 <br />14.4 <br />98.1 <br />513 <br />Pt. #4661 (N:19349.76/E:37851.13) <br />6089.4 <br />X <br />94.0 <br />11.7 <br />90.5 <br />11.1 <br />96.3 <br />417/418 r/c @9% <br />} 514 <br />Pt. #4662 (N :19525.22/E:37807.87) <br />6100.5 <br />X <br />95.7 <br />10.5 <br />86.5 <br />15.3 <br />90.3 <br />333/336 r/c @7% <br />515 <br />Pt. #4663 (N:19530.43/E:37917.94) <br />6100.2 <br />X <br />95.4 <br />10.8 <br />88.5 <br />10.9 <br />92.7 <br />339/340 r/c @11% <br />516 <br />Pt. #4664 (N:19471.58/E:38055.45) <br />6081.1 <br />X <br />96.5 <br />11.1 <br />86.9 <br />15.2 <br />90.1 <br />337a/338 r/c @12% <br />517 <br />Pt. #4665 (N:19580.31/E:37195.25) <br />9144.6 <br />X <br />98.5 <br />9.9 <br />89.0 <br />15.6 <br />90.3 <br />333/336 r/c @16 <br />518 <br />Pt. #4666 (N:19523.71/E:37234.45) <br />6145.9 <br />X <br />96.7 <br />10.4 <br />89.2 <br />11.2 <br />92.3 <br />339/340 r/c @14% <br />519 <br />Pt. #4667 (N:19574.96/E:37531.08) <br />6143.0 <br />X <br />95.7 <br />10.1 <br />86.3 <br />11.2 <br />90.1 <br />339/340 r/c @11% <br />MOISTURE / DENSITY SPECIFICATIONS <br />OBSERVATION / TESTING <br />FIELD OBSERVATIONS <br />Specified <br />Compaction Cohesive Soils <br />Requirement: 90% Cohesionless Soils <br />X <br />Full Time: <br />Part Time: <br />Number of Site Visits /Oay: <br />Testing Only: <br />Requested By (Company Name): <br />Bowie Resources <br />Date: <br />Day: <br />Weather: <br />Temp: <br />Wind: <br />Humidity: <br />16/2011 <br />Compaction Equipment <br />Sheepsfoot: <br />Smooth Drum Roller: <br />Vibratory: <br />Other (List Below): <br />Used: <br />I <br />S <br />M <br />rx <br />W <br />Th <br />F <br />S <br />I X I <br />I <br />Sun <br />Clear <br />X <br />Overcast <br />Rain <br />Snow <br />Specified <br />Moisture Cohesive Soils <br />Requirement: Ci /a Cohesionless Soils <br />X <br />I I <br />To 32 <br />32 - 50 <br />50 - 70 <br />70 - 85 <br />X <br />85 Up <br />I <br />X I <br />Still <br />X <br />Mod <br />High <br />Laboratory Testing ASTM D- <br />Cohesive Soils <br />Procedure: 698 <br />Cohesionless Soils <br />X <br />I <br />Dry <br />X <br />Mod <br />Humid <br />DENSI3DENSITY /COMPACTION TESTING WAS NOT PERFORMED <br />ON THIS DATE FOR THE FOLLOWING REASONS: <br />Insufficient amount <br />of material placed. <br />Informed <br />Company) Reo of <br />( p Y) of Test Results: <br />Ron Grimland <br />Buckhorn <br />to <br />contractor <br />was <br />our arrival <br />would <br />on <br />not informed prior <br />on site that the <br />not be working <br />this date. <br />ontractor Not <br />Inclement Weather: <br />Equipment Malfunction: <br />Unknown: <br />Working Due To: The Contractor Is: <br />Wet Material: <br />Conditioning Dry <br />Unsuitable Mat'i: <br />Field Copies <br />Given To: <br />ME Processing Frozen. Material: <br />, Processing <br />Contractor: <br />I I <br />MN Stripping and /or Grubbing: <br />I Moisture <br />Mat'I: ( <br />Client: <br />CM /GM: <br />PAGE 1 OF 1 <br />1111111 Stockpiling Fill: <br />I 'Removing <br />( <br />Other: <br />05- 126-CMT Bowie Mine No. 2 Gob Pile Stability 2009 +.xls DCR8- 16 -11jh #511 <br />