Laserfiche WebLink
PROJECT IDENTIFICATION <br />Task # : 003 <br />Date : 04/15/2009 <br />User : SLB <br />Agency or organization name : CDRMS <br />Permit or other job action :Phase I Bond Release <br />Task description :Regrade water treatment pond <br />HOURLY EQUIPMENT COST <br />Cost Breakdown : <br />MATERIAL QUANTITIES <br />Initial <br />volume : <br />2,567 <br />Source of estimated volume :Estimate based on Drawing 11 -4 <br />Source of estimated swell factor :Division estimate <br />HOURLY PRODUCTION <br />Average push distance : 75 feet <br />Unadjusted hourly production : 854.1 LCY /hr <br />Material consistency description : <br />Compacted fill or embankment <br />Average push gradient : 0.00 % (pos) <br />Average site altitude : 6,000 feet <br />Material weight : <br />Weight description : <br />Earth - Dry packed <br />JOB TIME AND COST <br />Fleet size : <br />Unit cost : <br />CCY <br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />State :Colorado <br />County : Gunnison <br />Site :Bear No. 3 <br />Basic machine :Cat D7R DS Series 11- 7SU <br />Blade type : Semi- Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 :3-shank ripper <br />Ownership cost/hour : <br />Operating cost/hour : <br />Ripper op. cost/hour : <br />Operator cost/hour : <br />Total unit cost/hour : <br />2,550 Ibs /LCY <br />1 Dozer(s) <br />$0.455 /LCY <br />Swell <br />factor : <br />$48.36 <br />$56.19 <br />$0.00 <br />$32.78 <br />$137.33 <br />1.125 <br />Permit/job# : C -1981 -033 <br />Abbreviation : none <br />Filename : CO33 -003 <br />Utilization % <br />NA <br />100 <br />0 <br />NA <br />Loose <br />volume : <br />Job Condition Correction Factors <br />Operator skill : <br />Material consistency : <br />Dozing method : <br />Visibility : <br />Job efficiency : <br />Spoil pile : <br />Push gradient : <br />Altitude : <br />Material weight : <br />Blade type : <br />Net correction : <br />Horsepower : <br />Shift basis : <br />Data source : <br />Total fleet cost/hour : $137.33 <br />Total job cost : $1,313 <br />2,888 LCY <br />240 <br />1 per day <br />(CRG) <br />Source <br />0.75 (avg.) <br />0.90 (Cat HB) <br />1.00 (gen.) <br />1.00 (avg.) <br />0.83 (1 shift/day) <br />0.70 (fnd -mf) <br />1.00 (Cat HB) <br />1.00 (Cat HB) <br />0.90 (Cat HB) <br />1.00 (S /SU /U) <br />0.35 <br />Adjusted unit production : 302.01 LCY /hr <br />Adjusted fleet production : 302.01 LCY /hr <br />Total job time : 9.56 Hours <br />