Laserfiche WebLink
PROJECT IDENTIFICATION <br />Task # : <br />Date : <br />User : <br />007 State :Colorado <br />04/15/2009 County : Gunnison <br />SLB Site : Bear No. 3 <br />Agency or organization name :CDRMS <br />Permit or other job action : Phase l Bond Release <br />Task description : Redistribute topsoil over facilities area <br />HOURLY EQUIPMENT COST <br />Cost Breakdown : <br />MATERIAL QUANTITIES <br />Initial <br />volume : <br />5,000 <br />HOURLY PRODUCTION <br />Material consistency description : <br />Consolidated stockpile <br />CCY <br />Ownership cost/hour : <br />Operating cost/hour : <br />Ripper op. cost/hour : <br />Operator cost/hour : <br />Total unit cost/hour : <br />Source of estimated volume :Permit application Volume 1, p. 2.05 -23R <br />Source of estimated swell factor :Division estimate <br />Average push distance : 300 feet <br />Unadjusted hourly production : 311.1 LCY /hr <br />Average push gradient : 0.00 % (pos) <br />Average site altitude : 6,000 feet <br />Material weight : 2,550 Ibs /LCY <br />Weight description : <br />Earth - Dry packed <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) <br />Unit cost : <br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />Basic machine : Cat D7R DS Series 11 - 7SU <br />Blade type : Semi- Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 :3-shank ripper <br />$1.311 /LCY <br />Swell <br />factor: <br />Permit/job# : C - 1981 - 033 <br />Abbreviation :none <br />Filename : CO33 -007 <br />Utilization % <br />$48.36 NA <br />$56.19 100 <br />$0.00 0 <br />$32.78 NA <br />$137.33 <br />Job Condition Correction Factors <br />Operator skill : <br />Material consistency : <br />Dozing method : <br />Visibility : <br />Job efficiency : <br />Spoil pile : <br />Push gradient : <br />Altitude : <br />Material weight : <br />Blade type : <br />Net correction : <br />Horsepower : 240 <br />Shift basis : 1 per day <br />Data source : (CRG) <br />Total fleet cost/hour : $137.33 <br />Loose <br />1.125 volume : 5,625 LCY <br />Total job cost : $7,373 <br />Source <br />0.75 (avg.) <br />1.00 (Cat HB) <br />1.00 (gen.) <br />1.00 (avg.) <br />0.83 (lshift/day) <br />0.60 (fnd -st) <br />1.00 (Cat HB) <br />1.00 (Cat HB) <br />0.90 (Cat HB) <br />1.00 (S /SU /U) <br />0.34 <br />Adjusted unit production : 104.77 LCY /hr <br />Adjusted fleet production : 104.77 LCY /hr <br />Total job time : 53.69 Hours <br />