DIVISION OF RECLAMATION, MINING AND SAFETY
<br />Department of Natural Resources
<br />1313 Sherman St., Room 215
<br />Denver, Colorado 80203
<br />Phone: (303) 866 -3567
<br />FAX: (303) 832 -8106
<br />April 29, 2009
<br />Mr. Daniel E. Bear
<br />Bear Coal Company
<br />P.O. Box 1754
<br />Paonia, Colorado 81428
<br />Dear Mr. Bear:
<br />Office of
<br />Mined Land Reclamation
<br />STATE OF COLORADO
<br />RE: Bear No. 3 Mine, Permit No. C -81 -033, Bear Coal Company
<br />SL -4, Partial Phase One Bond Release, Preliminary Adequacy Review
<br />COLORADO
<br />D I V I S I O N O F
<br />RECLAMATION
<br />MINING
<br />SAFETY
<br />Bill Ritter, Jr.
<br />Governor
<br />Harris D. Sherman
<br />Executive Director
<br />The Colorado Division of Reclamation, Mining and Safety (Division) has fmished its adequacy review of
<br />Bear Coal Company's (BCC) preliminary submittal of the partial phase one bond release (SL -4) for the
<br />Bear No. 3 Mine.
<br />Ronald W. Cattany
<br />Division Director
<br />Natural Resource Trustee
<br />The Division's preliminary review of the reclamation cost estimate for SL -4 assumes that BCC has completed
<br />the reclamation tasks for which bond release is being requested, and assumes the completed reclamation is in
<br />accordance with the approved plan, The Division estimates that the reclamation liability can be reduced by a
<br />maximum of $158,941.00. BCC has not requested Phase I release on the entire disturbance area, so the
<br />proposed release amount is less than the maximum release allowable by Rule 3.03.1(2)(a). The Division
<br />estimates that the revised required bond amount would be $120,283.00. Again, this estimate is made under the
<br />assumption that reclamation has been completed as reported by BCC. The Division notes that certain
<br />reclamation tasks remain and that these tasks need to be completed before SL -4 can be formally submitted.
<br />In accordance with Rule 3.03.1(2)(a), up to sixty percent of the applicable bond shall be released when the
<br />permittee successfully completes backfilling, regrading, and drainage control in accordance with the approved
<br />reclamation plan; up to eighty five percent shall be released upon the establishment of vegetation which
<br />supports the postmining land use and meets the approved revegetation success standards (Rule 3.03.1(2)(b));
<br />and the remaining reclamation bond may be released at the end of the revegetation responsibility period and
<br />when the permittee has successfully completed reclamation operations in accordance with the approved
<br />reclamation plan (Rule 3.03.1(2)(c)). For the Bear No. 3 Mine, the reclamation liability for the entire site was
<br />estimated in 2007 to be $279,224.00. Based on this original liability figure, maximum release amounts by rule
<br />are shown on the table below.
<br />BCC's preliminary document indicates that a Phase I bond release on the entire area will not be requested, and
<br />it is also apparent that BCC is requesting a release that is greater than that allowed by Rule 3.03.1(2)(a) (up to
<br />Office of
<br />Denver • Grand Junction • Durango Active and Inactive Mines
<br />Maximum Release
<br />Minimum Retention
<br />Initial Liability
<br />$279,224.00
<br />Phase I
<br />$167,534.40
<br />$111,689.60
<br />Phase II
<br />$69,806.00
<br />$41,883.60
<br />Phase III
<br />$41,883.60
<br />$0.00
<br />DIVISION OF RECLAMATION, MINING AND SAFETY
<br />Department of Natural Resources
<br />1313 Sherman St., Room 215
<br />Denver, Colorado 80203
<br />Phone: (303) 866 -3567
<br />FAX: (303) 832 -8106
<br />April 29, 2009
<br />Mr. Daniel E. Bear
<br />Bear Coal Company
<br />P.O. Box 1754
<br />Paonia, Colorado 81428
<br />Dear Mr. Bear:
<br />Office of
<br />Mined Land Reclamation
<br />STATE OF COLORADO
<br />RE: Bear No. 3 Mine, Permit No. C -81 -033, Bear Coal Company
<br />SL -4, Partial Phase One Bond Release, Preliminary Adequacy Review
<br />COLORADO
<br />D I V I S I O N O F
<br />RECLAMATION
<br />MINING
<br />SAFETY
<br />Bill Ritter, Jr.
<br />Governor
<br />Harris D. Sherman
<br />Executive Director
<br />The Colorado Division of Reclamation, Mining and Safety (Division) has fmished its adequacy review of
<br />Bear Coal Company's (BCC) preliminary submittal of the partial phase one bond release (SL -4) for the
<br />Bear No. 3 Mine.
<br />Ronald W. Cattany
<br />Division Director
<br />Natural Resource Trustee
<br />The Division's preliminary review of the reclamation cost estimate for SL -4 assumes that BCC has completed
<br />the reclamation tasks for which bond release is being requested, and assumes the completed reclamation is in
<br />accordance with the approved plan, The Division estimates that the reclamation liability can be reduced by a
<br />maximum of $158,941.00. BCC has not requested Phase I release on the entire disturbance area, so the
<br />proposed release amount is less than the maximum release allowable by Rule 3.03.1(2)(a). The Division
<br />estimates that the revised required bond amount would be $120,283.00. Again, this estimate is made under the
<br />assumption that reclamation has been completed as reported by BCC. The Division notes that certain
<br />reclamation tasks remain and that these tasks need to be completed before SL -4 can be formally submitted.
<br />In accordance with Rule 3.03.1(2)(a), up to sixty percent of the applicable bond shall be released when the
<br />permittee successfully completes backfilling, regrading, and drainage control in accordance with the approved
<br />reclamation plan; up to eighty five percent shall be released upon the establishment of vegetation which
<br />supports the postmining land use and meets the approved revegetation success standards (Rule 3.03.1(2)(b));
<br />and the remaining reclamation bond may be released at the end of the revegetation responsibility period and
<br />when the permittee has successfully completed reclamation operations in accordance with the approved
<br />reclamation plan (Rule 3.03.1(2)(c)). For the Bear No. 3 Mine, the reclamation liability for the entire site was
<br />estimated in 2007 to be $279,224.00. Based on this original liability figure, maximum release amounts by rule
<br />are shown on the table below.
<br />BCC's preliminary document indicates that a Phase I bond release on the entire area will not be requested, and
<br />it is also apparent that BCC is requesting a release that is greater than that allowed by Rule 3.03.1(2)(a) (up to