Laserfiche WebLink
9430 9430 <br />9420 <br />9410 <br />9400 <br />________________ <br />SOIL NAIL SHORING <br />PERMANENT STEEL <br />C SUPPORT <br />BY OTHERS(MES DRAWING <br />9/20/11) EXISTING <br />''"'� <br />GRD� E j <br />9420 <br />9410 <br />9400 <br />+ <br />Oo 0 0 <br />v o 0 0 <br />o a <br />00 <br />+ <br />--- _______ ------ <br />n�\ <br />/ �\ <br />_ <br />��i -- • , <br />4 <br />+ + + <br />+ + + + <br />+ <br />+ <br />+ 0 0 <br />o <br />, <br />n 14 0'.. <br />o o + <br />o <br />o <br />0 <br />0 + <br />o <br />+ <br />+ + l V <br />/�� <br />+ + <br />+ <br />0 <br />_0 <br />—o <br />SPICING SUPPORT <br />�-�VA <br />�,, f TEMPORARY <br />\' , .,PROPOSED GRADE <br />( \ %(U, <br />9380 / 9380 <br />-70 -60 -40 -20 0 20 40 60 70 <br />+ SOIL NAIL - 20FT 32Xmm INJECTION BAR C= �� \ <br />0 SPILING - 30FT 51mm INJECTION BAR (PRIMARY) v /'�,� <br />in SPILING - 3OFT 32mm INJECTION BAR (SECONDARY) \' <br />c ` <br />5 10 20 <br />Scale in Peet <br />I'1 <br />Yeh and Associates, Inc <br />DRAWN BY: MJW DATE: 10 - 0 <br />DATE: <br />PROJECT: <br />BULLDOG MINE <br />SHEET <br />4 <br />OF <br />g <br />CHECKED Br: BPn DATE: 10 11 <br />DESIGNED FOR: RIO GRANDE SILVER <br />PROJECT NUMBER: 211-190 <br />VIEW <br />SOIL NAIL SHORING <br />SCALE <br />HOR°: VERT: <br />Consulting Engineers & Scientists <br />