My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-10-17_REVISION - M2004013 (5)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2004013
>
2011-10-17_REVISION - M2004013 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:24:24 PM
Creation date
10/17/2011 12:02:19 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2004013
IBM Index Class Name
Revision
Doc Date
10/17/2011
Doc Name
Response to Adequacy Letter
From
Paul Banks and Associates, LLC
To
DRMS
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MONTH <br />(1) <br />(2) <br />(3) I <br />( <br />MONTH <br />TOTAL EVAPORATION - <br />AND OPERATIONAL <br />WATER LOSSES <br />CREDIT/DEPLETION <br />FROM REFILLING .. <br />TOTAL LAGGED <br />DEPLETIONS. <br />PBWW <br />REPLACEMENTS <br />TO ARKANSAS <br />- RIVERINCLUD(NG <br />1% TRANSIT LOSS' <br />JAN <br />(ACRE -FEET) <br />(ACRE -FEET) <br />(ACRE -FEET) <br />(ACRE -FEET) <br />JAN <br />- 0.82 <br />:0.00. <br />1.00 <br />1.62 <br />FEB <br />0.97 <br />.. .0.00 - . <br />1.42 <br />1.43 <br />MAR <br />1.34 <br />0.00 <br />1.55 <br />1.67 <br />APR <br />2.39 <br />0.00. <br />1.70 <br />.1,72 <br />MAY <br />3.21 <br />0.00 <br />2.16 <br />. 0.00 <br />JUN <br />3.95 <br />0.00 <br />2.52. <br />2,55 <br />JUL <br />3.73 <br />0.00 <br />. 2.92 <br />2.05 <br />AUG <br />3.36. . <br />0.00 <br />2.97 <br />3.00 <br />SEP <br />2.69 <br />0.00 <br />- 2.77 <br />2.80 <br />OCT <br />1.94. <br />0.00 <br />2.00 <br />2.63 .. <br />NOV <br />- 1.04 <br />0.00 <br />2.15 <br />2=17. <br />DEC <br />0.75. <br />. 0.00 <br />1.83. <br />1.85 <br />TOTAL <br />26.19 . <br />0.00 <br />26.19 - <br />25.47 <br />MONTH <br />TOTAL EVAPORATION <br />AND OPERATIONAL <br />WATER LOSSES <br />CREDR7DEPLETION <br />FROM REFILLING _ <br />TOTAL LAGGED <br />DEPLETIONS <br />PBWW <br />REPLACEMENTS <br />. TO ARKANSAS <br />RIVER INCLUDING <br />1% TRANSIT LOSS <br />MONTH <br />(ACRE -FEET) <br />(ACRE -FEET) <br />(ACRE -FEET) . <br />(ACRE -FEET) <br />JAN <br />0,82 <br />0.00. <br />1.71 <br />1.73 <br />FEB <br />0.97 <br />0.00 <br />150 <br />1.52 I <br />MAR <br />1.34 <br />0.00 <br />1.82 <br />1,64 <br />APR <br />2.39 <br />0.00 <br />1.77. <br />1.70 <br />MAY <br />3.21 <br />0.00 <br />, 2.23 <br />2.25 <br />JUN <br />4.11 <br />-2:75 <br />0,00 <br />. 0.00 <br />JUL <br />3.91 <br />0.00 <br />3.04 <br />3.07 <br />AUG <br />3.36 <br />2.75. <br />3.50 <br />3.54 <br />SEP . <br />. 2.69 - <br />.0,00 <br />3.54 <br />3,58 <br />001' <br />- 1.94 <br />0.00 <br />2.99 <br />- .3,02' <br />NOV <br />1.04 <br />0.00. <br />.. 2.39 <br />2.40 <br />DEC <br />0.75 <br />- 0.00 _ <br />... .2.01 . <br />. . .2.03 <br />''. TOTAL <br />26.53 <br />0.00 <br />26.29 <br />26.57 <br />.__. __.. <br />(1) <br />(2) <br />(3 ) , <br />.. (4) . I <br />MONTH <br />TOTAL EVAPORATION <br />AND OPERATIONAL <br />CREDIT/DEPLETION <br />FROM REFILUNG <br />TOTAL LAGGED <br />PBWW • <br />REPLACEMENTS <br />TO ARKANSAS <br />RIVER INCLUDING <br />1% TRANSIT LOSS <br />. WATER LOSSES <br />DEPLETIONS <br />1ACRE- FEET). <br />.(ACRE -FEET) <br />(ACRE -FEET) <br />. (ACRE -FEET) <br />(ACRE -FEET) <br />JAN . <br />0,02. <br />0.00 <br />1.59 <br />'1.61 <br />FEB <br />. 0,91 <br />0.00 <br />1.37 - <br />1.30 ... <br />. MAR <br />1,34 <br />0.05 <br />1.55 <br />.1.57 . <br />APR <br />. 2.30 <br />0.00 <br />1.70. <br />1.72 <br />MAY <br />3.21 <br />0.50 <br />2.18 <br />2.18 <br />JUN <br />4.11 <br />-2.75 ' <br />0.00 <br />0.00 <br />. JUL <br />3.91 <br />0.00 <br />2.99 . <br />3.02 • <br />AUG <br />- .3.30 <br />- 2:75 <br />3.45 - <br />3.40 . . <br />SEP <br />2,69 <br />0.00 <br />:3.50- <br />3.54 <br />OCT <br />1.94 <br />0.00 <br />2.95 .. <br />...2.98 <br />NOV <br />1.04. <br />'0.00 <br />. 2.34 . <br />' 2.36 <br />DEC <br />0.75 <br />0 <br />:. 1.97 <br />.. ' 1.99 <br />l TOTAL <br />26.53 <br />- 0 00 <br />5.57. <br />25.83 <br />SCENARIO A- MINING OCCURS AND. POND 5 REFILLS IN AUGUST FOLLOWING MINING <br />NOTES: <br />(1): COL (8) - (FROM TABLE 1) <br />(2): BASED ON 2 FT FILL DEPTH OF POND 5 AND 0IMENSIONS 'OF 200 BY 200' (CREDIT IS <br />OBTAINED INSTANTANEOUSLY FOR CREDIT IN JUNE WHEN PIT IS OEWATERED. THE DEPLETION <br />CAUSED BY REFILLING IS LAGGED 70 THE SOUTH.PLATTE RIVER AS IF IT WERE AN EVAPORATION • <br />OR OFERATIONALLOSS) <br />(3): BASED ON STREAM DEPLETION MODEL (CANNOT BE NEGATIVE) <br />(4): COL (3) +. 1 % TRANSIT LOSS <br />SCENARIO O- NO MINING OCCURS AND NO REFILUNG OCCURS <br />Year 2011 <br />NOTES: <br />(1): COL (0) - (FROM TABLE 1) <br />(2): BASED ON 2 FT FILL DEPTH OF POND 5 AND DIMENSIONS OF 300 8Y 200 (CREDIT IS <br />OBTAINED INSTANTANEOUSLY FOR CREDIT IN JUNE WHEN PIT IS OEWATERED. THE DEPLETION <br />CAUSED BY REFILUNG IN AUGUST IS LAGGED TO THE SOUTH PLATTE RIVER AS IF R WERE AN • <br />EVAPORATION OR OPERATIONAL LOSS) <br />(3): BASED ON STREAM DEPLETION MODEL <br />(4): COL (3) + 1% TRANSIT LOSS <br />TABLE 2 <br />TOTAL LAGGED STREAM DEPLETIONS FOR YEARS 2009 AND 2010 <br />ST. BARBARA SAND AND GRAVEL MINE <br />Year 2012 . <br />then and 05+4 Waive Co+ 3 58 Me <br />Year 2012 <br />(2) <br />3 ) . <br />NOTES: <br />(1) COL (6 - (FROM TABLET) <br />(2): BASED ON 2 F7 FILL DEPTH OF POND 5 ANDOIMENSIONS OF 300 BY 200' (CREDIT IS <br />OBTAINED INSTANTANEOUSLY FOR CREDIT IN 'JUNE WHEN PIT IS OEWATERED. THE DEPLETION <br />CAUSED BY REFILLING IS LAGGED TO THE 5011TH PLATTE RIVER AS IF IT WERE AN EVAPORATION <br />OR OPERATIONAL LOSS) <br />(3): BASED ON STREAM DEPLETION MODEL (CANNOT BE NEGATIVE) <br />(4): COL (3) + 1 %TRANSIT L052 <br />NOTES: <br />(1) COL (0) - (FROM TABLE 1) <br />(2): BASED ON 2 FT FILL DEPTH OF POND 5 AND DIMENSIONS OF 300' BY 205'. (0 860)7 (5 <br />OBTAINED INSTANTANEOUSLY FOR CREDIT INJUNE WHEN PIT IS OEWATERED. THE DEPLETION <br />CAUSED BY REFILUNG IN AUGUST IS LAGGED TO THE SOUTH PLATTE RIVER AS IF IT WERE AN <br />EVAPORATION 08 OPERATIONAL LOSS) <br />(3): BASED I/N.078E DEPLETION MODEL <br />(4): COL (3) + 1% TRANSIT LOSS <br />L <br />(1). <br />(2) <br />( <br />(4) <br />MONTH. <br />TOTAL EVAPORATION <br />AND OPERATIONAL <br />WATER. LOSSES <br />CREDIT/DEPLETION <br />. FROM REFILUNG <br />TOTAL LAGGED <br />DEPLETIONS. <br />PBWW <br />REPLACEMENTS <br />TO ARKANSAS <br />RIVER INCLUDING <br />.1% TRANSIT LOSS <br />(ACRE -FEET) • <br />1ACRE- FEET). <br />• (ACRE -FEET) - <br />. . TACRE -FEET) <br />JAN <br />0.62 <br />0.00 <br />1.00 <br />. 1.61' . <br />FEB. <br />0.97 <br />0.00 <br />. • 1.37 <br />1.38 <br />MAR <br />1.34 <br />- 0.00 - <br />155. <br />1.57 <br />APR <br />2.39 <br />0.50 <br />- 1.70.. <br />1.72 <br />MAY <br />3.21 <br />0.00 . <br />2.16 <br />2.18 <br />JUN <br />3.95 <br />0.00 <br />2:52 , <br />2.55 <br />JUL <br />3,73 <br />0.00 <br />2.92. <br />2.95 <br />AUG <br />3.36 <br />0.00 <br />' 2.97 <br />3.00 <br />SEP <br />2.69 <br />D.00 <br />' 2.77 . <br />2.60 <br />OCT <br />1.04 <br />0.00 <br />2:60 ' <br />2.63 . <br />NOV <br />1.04 <br />0.00 <br />.2.14. - - <br />2:16 <br />DEC <br />0.75 <br />0.00 .. <br />.. 1.83 <br />1.05 • <br />TOTAL <br />20.19 <br />- 0.00' -.. <br />.. 26.12 <br />26.40 <br />SCENARIO A- MINING OCCURS AND. POND 5 REFILLS IN AUGUST FOLLOWING MINING <br />NOTES: <br />(1): COL (8) - (FROM TABLE 1) <br />(2): BASED ON 2 FT FILL DEPTH OF POND 5 AND 0IMENSIONS 'OF 200 BY 200' (CREDIT IS <br />OBTAINED INSTANTANEOUSLY FOR CREDIT IN JUNE WHEN PIT IS OEWATERED. THE DEPLETION <br />CAUSED BY REFILLING IS LAGGED 70 THE SOUTH.PLATTE RIVER AS IF IT WERE AN EVAPORATION • <br />OR OFERATIONALLOSS) <br />(3): BASED ON STREAM DEPLETION MODEL (CANNOT BE NEGATIVE) <br />(4): COL (3) +. 1 % TRANSIT LOSS <br />SCENARIO O- NO MINING OCCURS AND NO REFILUNG OCCURS <br />Year 2011 <br />NOTES: <br />(1): COL (0) - (FROM TABLE 1) <br />(2): BASED ON 2 FT FILL DEPTH OF POND 5 AND DIMENSIONS OF 300 8Y 200 (CREDIT IS <br />OBTAINED INSTANTANEOUSLY FOR CREDIT IN JUNE WHEN PIT IS OEWATERED. THE DEPLETION <br />CAUSED BY REFILUNG IN AUGUST IS LAGGED TO THE SOUTH PLATTE RIVER AS IF R WERE AN • <br />EVAPORATION OR OPERATIONAL LOSS) <br />(3): BASED ON STREAM DEPLETION MODEL <br />(4): COL (3) + 1% TRANSIT LOSS <br />TABLE 2 <br />TOTAL LAGGED STREAM DEPLETIONS FOR YEARS 2009 AND 2010 <br />ST. BARBARA SAND AND GRAVEL MINE <br />Year 2012 . <br />then and 05+4 Waive Co+ 3 58 Me <br />Year 2012 <br />(2) <br />3 ) . <br />NOTES: <br />(1) COL (6 - (FROM TABLET) <br />(2): BASED ON 2 F7 FILL DEPTH OF POND 5 ANDOIMENSIONS OF 300 BY 200' (CREDIT IS <br />OBTAINED INSTANTANEOUSLY FOR CREDIT IN 'JUNE WHEN PIT IS OEWATERED. THE DEPLETION <br />CAUSED BY REFILLING IS LAGGED TO THE 5011TH PLATTE RIVER AS IF IT WERE AN EVAPORATION <br />OR OPERATIONAL LOSS) <br />(3): BASED ON STREAM DEPLETION MODEL (CANNOT BE NEGATIVE) <br />(4): COL (3) + 1 %TRANSIT L052 <br />NOTES: <br />(1) COL (0) - (FROM TABLE 1) <br />(2): BASED ON 2 FT FILL DEPTH OF POND 5 AND DIMENSIONS OF 300' BY 205'. (0 860)7 (5 <br />OBTAINED INSTANTANEOUSLY FOR CREDIT INJUNE WHEN PIT IS OEWATERED. THE DEPLETION <br />CAUSED BY REFILUNG IN AUGUST IS LAGGED TO THE SOUTH PLATTE RIVER AS IF IT WERE AN <br />EVAPORATION 08 OPERATIONAL LOSS) <br />(3): BASED I/N.078E DEPLETION MODEL <br />(4): COL (3) + 1% TRANSIT LOSS <br />L <br />
The URL can be used to link to this page
Your browser does not support the video tag.