My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-10-12_REPORT - M1990106
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1990106
>
2011-10-12_REPORT - M1990106
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2018 3:52:33 PM
Creation date
10/14/2011 11:35:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1990106
IBM Index Class Name
REPORT
Doc Date
10/12/2011
From
RBK Constr.
To
DRMS
Permit Index Doc Type
Annual Fee/Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Notice of Intent to continue Mining Operations <br />1 Mk Construction Materials Annual Report <br />Pennittee Name: • j , G o .A7 s (,%-c T ' o ..a . i N C <br />Permit No.: /vl 19 9 0 - / ° 6 <br />Operation Name: K. 6. K P 'T Al of 3 0 <br />Anniversary Date: / 0 -- / w a 0 1/ <br />Total: 3 %% <br />1. a. Permitted acreage: ?' % b. County where mine is located: - i t. e <br />YES <br />MORE <br />YES <br />2. Has this mine been granted TEMPORARY CESSATION STATUS? <br />Does . the mine operate MORE or LESS than 180 days per year? <br />3. Does this mine have a phased reclamation plan? <br />4. Total acres affected during the report year:* <br />5. Total acres reclaimed - for the report year:* - <br />6. Total number of acres in topsoil replacement stage: <br />a. Average thickness of topsoil replaced: <br />7. Total number of acres seeded: <br />a. List species seeded & seeding rate for report year on back <br />8. For non - phased operations provide dates extraction ceased: <br />a. Date reclamation began: <br />9. The type and approximate quantity of fertilizers; organic material or soil conditioners <br />used for the report year: * <br />10. Estimated total acres to be affected in the next report year: * <br />Contact Name: <br />Company: <br />Address: <br />f ' D, 13 © 3 g <br />(' e o 9/0& <br />Federal Tax ID No. or Social Security No.: <br />1'•' c <br />1 1 . COMMENTS: ,N c 4 C h a ..vy e 5 ' tNce , - 1- <br />A nJ ../- Q L. I� r � o rT 5 e "17 1 N <br />* Please show the location of the acreage for items 4 - 6 on your map * *. Indicate the phases of the reclamation <br />which have been completed, correlated with your timetable. For phased operations show dates extraction <br />ceased and dates reclamation began. <br />** NOTE: If th-re ave not been any changes since the last annual report and you previously submitted a map <br />which correctly ' epi is the current acreage n items 2 ough 6, then a new map is unnecessary. However, this <br />must be stated <br />Signs e Date: 0 <br />Please type or pri current contact nailing address, and phone number below: <br />Phone: '°71 •- '189- 3 3 8 <br />FAX NO: '7/ 2/89 - c2S 6 � <br />
The URL can be used to link to this page
Your browser does not support the video tag.