My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-04-21_REVISION - C1981033
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981033
>
2009-04-21_REVISION - C1981033
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:45:47 PM
Creation date
10/14/2011 10:57:41 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981033
IBM Index Class Name
REVISION
Doc Date
4/21/2009
Doc Name
Preliminary Adequacy Review
From
Susan Burgmaier
To
Joe Dudash
Type & Sequence
SL4
Email Name
JJD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Machine <br />Description <br />Weight/unit <br />(Tons) <br />Ownership <br />Cost/hr /unit <br />Haul Rig <br />Cost/hr /unit <br />Fleet Size <br />(No. units) <br />Haul Trip <br />Cost/hr /fleet <br />Return Trip <br />Cost/hr /fleet <br />DOT permit <br />Cost/fleet <br />-Cat D3G XL - 3P <br />9.81 <br />$11.29 <br />$88.67 <br />1 <br />$99.96 <br />$88.67 <br />$0.00 <br />-Cat D7R DS Series 11- 7SU <br />35.17 <br />$41.70 <br />$117.55 <br />1 <br />$159.25 <br />$117.55 <br />$0.00 <br />-Cat 325C L <br />31.07 <br />$38.60 <br />$117.55 <br />1 <br />$156.15 <br />$117.55 <br />$0.00 <br />- Revegetation equipment <br />20.00 <br />$60.00 <br />$88.67 <br />1 <br />$148.67 <br />$88.67 <br />$0.00 <br />Subtotals : <br />$564.03 <br />$412.44 <br />$0.00 <br />PROJECT IDENTIFICATION <br />Agency or organization name :CDRMS <br />CIRCES Cost Estimating Software <br />EQUIPMENT MOBILIZATION / DEMOBILIZATION <br />Task # : 014 State :Colorado <br />Date : 04/17/2009 County : Gunnison <br />User : SLB Site :Bear No. 3 <br />Permit or other job action :Phase I Bond Release <br />Task description :Haul equipment for initial reclamation <br />Permit/job # :C- 1981 -033 <br />Abbreviation : none <br />Filename :CO33 -014 <br />sheet 1 of 2 <br />EQUIPMENT TRANSPORT RIG COST <br />NON - ROADABLE EQUIPMENT <br />Shift basis : 1 per day <br />Cost data source : CRG Data <br />Truck tractor description : Generic on- highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description :Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 1007) <br />Cost Breakdown : <br />0 -25 Tons <br />$16.63 <br />$44.38 <br />$27.66 <br />$0.00 <br />$88.67 <br />26 -50 Tons <br />$18.37 <br />$46.13 <br />$27.66 <br />$25.39 <br />$117.55 <br />Available rig capacities : <br />Ownership cost/hour : <br />Operating cost/hour : <br />Operator cost/hour : <br />Helper cost/hour : <br />Total Unit Cost/hour : <br />51+ Tons <br />$22.33 <br />$50.07 <br />$27.66 <br />$25.39 <br />$125.45 <br />
The URL can be used to link to this page
Your browser does not support the video tag.