My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1997-07-28_GENERAL DOCUMENTS - M1973021 (9)
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1973021
>
1997-07-28_GENERAL DOCUMENTS - M1973021 (9)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2021 9:13:20 AM
Creation date
10/14/2011 7:16:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1973021
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
7/28/1997
Doc Name
1996 Annual Report- Geotechnical Addendum.
From
CAMAS
To
DMG
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
and were used during development in combination with benches equal to or greater <br /> than 40-ft wide. The existing slope location is temporary and the highwalls and <br /> benches will change as the quarry is further developed. <br /> In addition, drainage diversion improvements were constructed in the southwest and <br /> ' southern parts of the Central Quarry in general accordance with approved drainage <br /> plans. These improvements consisted of 1) a contour diversion, 2) installation of <br /> three sedimentation drop structures, and 3) installation of a temporary 24-in. <br /> corrugated steel diversion culvert (with upstream settling pond)under a temporary <br /> haul road fill. <br /> ' 3.3 North Quarry <br /> Redevelopment and reconfiguration of the North Quarry per expansion approved in <br /> ' Amendment No. 4 was initiated during 1995. In general mining advanced from south <br /> and east to north and west, progressing up the ridge along the northeast and north <br /> boundaries of the North Quarry. This process continued at a larger scale during 1996 <br /> ' as mining activities for the year were concentrated in the North Quarry. North <br /> Quarry mining began primarily as a south to north operation, but was changed to <br /> primarily an east to west operation during 1996. This change was made by CAMAS <br /> ' to create more favorable interim mining slope orientations with respect to a dominant <br /> southerly dipping foliation jointing that exists in the North Quarry. <br /> ' Mining generally progressed in a sequence of 40-ft vertical highwalls with benches <br /> equal to or greater than 40-ft wide and, locally, 80-ft vertical highwalls with benches <br /> equal to or greater than 80-ft wide. Due to the geometry of the ridge and the mining <br /> ' sequence, none of the 1996 highwalls in this area were expected to be final quarry <br /> highwalls at the ultimate mine build-out. Hence, detailed geotechnical evaluations <br /> were not necessary and were not performed in the North Quarry during 1996, but <br /> ' routine observations were made. <br /> ' 4 G:\PROJECTS\20200\002\96ANNRPT.WPD <br />
The URL can be used to link to this page
Your browser does not support the video tag.