My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-10-11_REVISION - P2011010
DRMS
>
Day Forward
>
Revision
>
Prospect
>
P2011010
>
2011-10-11_REVISION - P2011010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:37:36 AM
Creation date
10/13/2011 1:24:02 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2011010
IBM Index Class Name
REVISION
Doc Date
10/11/2011
Doc Name
Approval to Commence Prospecting (MD-01)
From
DRMS
To
Rio Grande Silver, Inc.
Type & Sequence
MD1
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT IDENTIFICATION <br />Date : 11- Oct -2011 <br />User: <br />RCO <br />Agency or organization name :DRMS <br />Permit or job action :Modification MD -1 <br />TASK LIST (DIRECT COSTS) <br />NO. <br />011 <br />. 012 <br />013 <br />014 <br />- Fracture foundation and remove structures <br />- Close and seal underground borehole <br />-Additional pad grading (and cover foundation) <br />- Haul additional reclamation equipment to and from site <br />* includes inflation factor adjustment of : NA <br />demolish <br />borehole <br />dozer <br />mobilize <br />1 <br />1 <br />1 <br />1 <br />SUBTOTALS: <br />TOTAL DIRE <br />12.00 <br />8.00 <br />7.63 <br />7.00 <br />34.63 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT - <br />* assume net hours = 50% of task hours <br />LEGAL - ENGINEERING • PROJECT MANAGEMENT - <br />Financial warranty processing (legal /related costs) : <br />Engineering work and /or contract/bid preparation : <br />Reclamation management and /or administration <br />CONTINGENCY - <br />* contingencies accounted for at task level <br />CIRCES Cost Estimating Software <br />COST SUMMARY FORM <br />Permit or job no. : <br />Abbreviation : <br />Filename : <br />TASK DESCRIPTION <br />Liability insurance : <br />Performance bond : <br />Job superintendent : <br />Profit : <br />P - 2011 - 010 <br />Site :Equity Exploration Project <br />State :Colorado <br />P010 -000 County :Mineral <br />none <br />FORM FLEET TASK <br />USED SIZE HOURS <br />2.02 % of direct <br />1.05 % of direct <br />17.31 hrs *... $ /hr. $52.10 <br />10.00 % of direct <br />0.00 <br />4.25 <br />5.00 <br />NA* <br />total $ <br />% of cntr. <br />% of cntr. <br />NA <br />NA <br />NA <br />NA <br />T COST * = <br />total = <br />total = <br />total = <br />total = <br />TOTAL 0 &P= <br />CONTRACT AMOUNT (direct + O & P) = <br />total = <br />total = <br />total = <br />total = <br />TOTAL INDIRECT COST = <br />DIRECT <br />COST <br />$2,324 <br />$1,391 <br />$853 <br />$2,244 <br />$6,812 <br />$6,812 <br />$138 <br />$ 72 <br />$902 <br />$681 <br />$1,792 <br />$8,604 <br />$0 <br />$366 <br />$430 <br />NA <br />$2,588 <br />TOTAL BOND AMOUNT (direct + indirect) = $9,400 <br />
The URL can be used to link to this page
Your browser does not support the video tag.