Laserfiche WebLink
MciyDay Idaho Mine Complex <br />Re Permanent Man -made Structures, Damage Compensation Agreement <br />Structure Owner; and Wildcat Mining. Corporation (May Day Idaho Mine. Complex) <br />Dear Structure•Ownei, <br />Wildcat Mining Coiporation (WMC) has enclosed a Damage Compensation Agreement for your <br />consideration in the event the May Day Idaho Mine Complex operated by WMC damages your <br />property during the life ofthe project. The Damage Compensation Agreement is being offered <br />pursuant the Colorado Division of Reclamation Mining and Safety (CDRMS) rule 6.4.20. <br />Pursuant to Rule 6:4:20, the Applicant: shall provide information sufficient demonstrate that <br />the stability of any structures located within 200 feet of the permit boundary will not be <br />adversely affected. If the Office determines that such information is inadequate to demonstrate <br />that the operation will not adversely affect the stability of any significant, valuable and <br />permanent man -made structure, the Applicant shall either: <br />(a) Provide a notarized agreement between the Applicant and the person(s) having an <br />interest in the structure, that the Applicant is to 'provide compensation for any <br />damage to the structure; or <br />(b) Where such an agreement cannot be reached, the Applicant shall provide an <br />appropriate engineering evaluation that demonstrates that such structure shall not <br />be damaged by activities occurring at the mining operation; or <br />(c) When such structure is a utility, the Applicant may supply a notarized letter, on <br />utility letterhead, from the owner(s) ofthe utility that the mining and reclamation <br />activities, as proposed, will have "no negative effect" on their utility. <br />Based on recorded information, the permanent man-made structures are within 200 feet of WMC <br />operation which could affect the boundary fence. As an agent of Wildcat Milling Corporation, <br />we request your review and consideration to sign a Damage Compensation Agreement such as <br />the one that is attached to this letter. Wildcat has conducted an engineering and hydrogeologic <br />evaluation of the site and has determined the proposed May Day Idaho Mine Complex will not <br />damage your structures by activities occurring at the mine site. <br />"La Plata County Industry Marking a difference fora "Green" Future" <br />5555 DTC Parkway, Suite A -4000 <br />Greenwood village; Colorado 80111 <br />Phone: 303 - 8327664 Fox: 303-832-7469 <br />