My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-10-11_REVISION - M1981185
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981185
>
2011-10-11_REVISION - M1981185
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:58:22 PM
Creation date
10/12/2011 9:21:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981185
IBM Index Class Name
REVISION
Doc Date
10/11/2011
Doc Name
Response to 6th adequacy letter to CN-01
From
GreenbergTraurig for Wildcat Mining Corporation
To
DRMS
Type & Sequence
CN1
Email Name
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Legal Description <br />Exhibit A <br />Beginning at the southwest corner of the Payday Mill Site "MS 19516B ", being a BLM 3- <br />1 /4" aluminum cap; <br />Thence N 14 °21'46 "W, 576.64 feet along the westerly line of said Payday Mill Site, <br />being a BLM 3 -1/4" aluminum cap; <br />Thence N 10 °25'08 "W, 493.91 feet to the northwesterly corner of said Payday Mill Site, <br />being a rebar with a 2 -1/4" aluminum cap stamped "PLS 37060 "; <br />Thence N 78 °06'00 "E, 199.25 feet to the northeasterly corner of said Payday Mill Site, <br />being a BLM 3-1/4" aluminum cap; <br />Thence S 18 °33'00 "E, 712.12 feet along the easterly line of said Payday Mill Site to a <br />BLM 3 -1/4" aluminum cap, said point intersecting the northerly line of the Idaho Mill <br />Site "MS 18320 "; <br />Thence N 71°45'44"E, 193.81 feet along the northerly line of said Idaho Mill Site to the <br />northeasterly corner of said Idaho Mill Site, being a BLM 3 -1/4" aluminum cap; <br />Thence S 18°30'12"E, 386.83 feet along the easterly line of said Idaho Mill Site to the <br />southeasterly comer of said Idaho Mill Site, being a BLM 3 -1/4" aluminum cap; <br />Thence S 71 °37'48 "W, 399.70 feet along the southerly line of said Idaho Mill Site to a <br />BLM 3 -1/4" aluminum cap; <br />Thence N 29 °00'00 "W, 22.18 feet along the westerly line of said Idaho Mill Site and <br />intersecting with said Payday Mill Site, being a 3 -1/4" BLM aluminum cap; <br />Thence N 88 °42' 18 "W, 23.23 feet along the southerly line of said Payday Mill Site to the <br />point of beginning. <br />Containing 8.2 acres, more or less (Figure C -4). <br />Augmentation Pipeline Corridor will occupy an affected area of 0.4 acres <br />within the Idaho -Pay Day Affected Area. The location of the proposed corridor is <br />illustrated on Figure C -4. <br />Chief Tunnel: Figure C -4 illustrates the location of the Chief Tunnel. The affected area <br />is 0.3 acres (Figure C -4). <br />CHIEF AFFECTED AREA DESCRIPTION: <br />A tract of land located in Section 28, T36N, R11 W, N.M.P.M., La Plata County, <br />Colorado, and being described more particularly as follows: <br />Beginning at a point whence the W1 /4 Corner of said Section 28 bears <br />S 60 °01'59 "W, 4159.71 feet; <br />Thence N 07 °16'21 "E, 93.71 feet; <br />Thence N 71°25'15"E, 83.77 feet; <br />Thence S 51 °05'27 "E, 59.42 feet; <br />Thence S 12 °59'27 "E, 27.63 feet; <br />Wildcat Mining Corporation <br />May Day Idaho Mine Complex — 112d Permit Application <br />Revised October, 2011 <br />Exhibit A — Rule 6.4.1 <br />Page 3 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.