My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-09-30_REVISION - C1981008 (6)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981008
>
2011-09-30_REVISION - C1981008 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:43:35 PM
Creation date
10/12/2011 8:47:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
REVISION
Doc Date
9/30/2011
Doc Name
Topsoil Sample Plan for TR-61 Submittal
From
Chris Kamper
To
DRMS, Lance Wade
Type & Sequence
TR61
Email Name
DAB
MLT
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
This form must be completed and submitted with all requests for minor revisions, as defined in Rule 1.04(73), <br />technical revisions, as defined in Rule 1.04(136), and permit revisions, as defined in Rule 1.04(90). All revisions <br />are to address the requirements of Rule 2.08.4. Three (3) copies of the revision, including maps, must be <br />submitted in order for it to be complete. <br />All revisions are to be formatted so they can be inserted into the permit to replace the revised sections, maps, <br />tables and /or figures, with a revised table of contents, if necessary. The revision submittal date should be printed <br />in the lower right corner of each revision page. A cover letter to the revision should explain the nature of the <br />revision and reference the specific permit sections being revised. <br />For federal mines, a copy of the revision application must be submitted to all agencies on the federal mailing list <br />(except OSM) at the same time the application is submitted to the Division, and proof of distribution must be <br />submitted to the Division along with the application. Copies of revision pages modified during the review process <br />must be distributed in the same manner, along with proof of distribution. Proof of distribution must be submitted <br />prior to implementation of the revision. <br />Permit No.: c - 81 8 Date: 09 / 30 / 2011 <br />Permittee: Western Fuels- Colorado <br />Street: <br />City: <br />State: <br />COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br />1313 Sherman Street, Room 215, Denver, Colorado 80203, (303) 866 -3567 <br />APPLICATION FORM FOR A REVISION <br />TO A COAL MINING AND RECLAMATION PERMIT <br />P.O. Box 628 <br />27646 W. 5th Ave <br />Nucla <br />CO Zip Code: 81424 <br />Brief Description of Revision: <br />Public Notice Attached: Yes <br />Bond Increase: YesE No <br />Proposed Change in: <br />Permit Area - <br />Disturbed ( + / - )0 _ . _ Acres <br />Permit ( +/ -)0 _ Acres <br />Affected ( + / -)0 _ _ _ Acres <br />Mineral Ownership - <br />Mineral Private ( + / -) 0 _ _ _ Acres <br />Mineral Federal ( + / -) 0 _ Acres <br />Stockpile, Morgan undisturbed soil, and Morgan <br />redistributes soil sampling plan. <br />No D(Required for PRs and TRs) <br />Federal El Non - Federal <br />Mine <br />Surface Ownership - <br />Private Land (+00 _ Acres <br />Federal Land ( +/ -) 0 _ Acres <br />State Land <br />( + / -) 0 _ _ . _ Acres <br />Mineral State ( +/ -) 0 _ _ _ Acres <br />
The URL can be used to link to this page
Your browser does not support the video tag.