Laserfiche WebLink
On August 9, 2011, the Colorado Division of Reclamation, Mining, and Safety required WFC to <br />assemble a sampling plan for the stockpiles of soil on the Morgan property, as well as sampling <br />of undisturbed prime farmland soils on the Morgan property. This sampling plan, assembled by <br />Key -AG and WFC in consultation with NRCS, OSM, and DRMS, will satisfy the requirements of <br />that letter. <br />This attachment contains the sampling plan, sampling plan map (Map 2.04.9 -3), and several <br />blank pages reserved for the future placement of the sampling plan results. <br />Revised October 2011 (TR -61) Attachment 2.04.9 -10 -2 <br />