Laserfiche WebLink
Mr. Jared Dains <br />SerFer Pit M- 2008 -006 <br />October 11, 2011 <br />quality data or analyses may be requested at any time to determine if the requirement of <br />use of the senior appropriator is met. _ <br />18. The decision of the State Engineer shall have no precedential or evidentiary force, shall not <br />create any presumptions, shift the burden of proof, or serve as a defense in any water court <br />case or any other legal action that may be initiated concerning the SWSP. This decision <br />shall not bind the State Engineer to act in a similar manner in any other applications <br />involving other plans or in any proposed renewal of this plan, and shall not imply <br />concurrence with any findings of fact or conclusions of law contained herein, or with the <br />engineering methodologies used by the Applicant. <br />If you have any questions concerning this approval, please contact Claudia Engelmann in <br />Greeley at (970) 352 -8712 or Joanna Williams in Denver at (303) 866 -3581. <br />Attachments: Tables 1, 2, 3 <br />Cc: Claudia Engelmann, Assistant Division Engineer, Div1Accountinqstate.co.us <br />810 9 Avenue, Suite 200, Greeley, Colorado 80631, (970)- 352 -8712 <br />George Varra, Water Commissioner, Water District 3, George.Varra(cz�state.co.us <br />1400 Hwy 287 N, Fort Collins, Colorado 80524, (970) 484 -1628) <br />Division of Reclamation Mining and Safety <br />KGR /jmh /SerFer Pit_2011- 2012.doc <br />Sincerely, <br />n Rein, P.E., <br />istant State Engineer <br />Page 5 <br />