My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-10-06_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2011-10-06_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:30 PM
Creation date
10/12/2011 8:00:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
10/6/2011
Doc Name
Weekly Construction Quality Assurance ("CQA") Reports: Weeks of 9/10, 9/17, and 9/24/2011.
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
BMK
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GENERAL PROJECT ITEMS <br />Summary of Concerns: <br />No concerns <br />Summary of Non - conformances: <br />None Issued <br />Ames Construction: <br />None <br />AMEC: <br />None <br />Summary of Incidents/Accidents /Health & Safety Issues: <br />None <br />Date: September 10, 2011 <br />Approv d By: Date: <br />9`3 ©/" <br />Joseph Hickey, CQA Monitor <br />one <br />Summary of Planning Items: <br />Continue subgrade acceptance prior to SLF placement within the Phase 5 VLF. <br />Continue slope contouring and subgrade preparation within the Phase 5 VLF. <br />Continue SLF placement within the Phase 5 VLF <br />Continue subgrade acceptance prior to geomembrane deployment within Phase 5 VLF. <br />Continue geomembrane installation within Phase 5 VLF. <br />Continue obtaining samples and assisting in the process of DCF material at the DCF Process area. <br />Continue excavation and backfill of the existing (temporary) anchor trench within the Phase 5 VLF. <br />Continue geomembrane exposure within the Phase 5 VLF. <br />Continue installation of the high volume solution collection system within the Phase 5 VLF. <br />Continue DCF placement within the Phase 5 VLF. <br />Continue leak detection system installation within the Phase 5 VLF. <br />Continue 80mi1 primary geomembrane acceptance within the Phase 5 VLF. <br />Summary of Meetings and Discussions: <br />CC &V: <br />CC &V held a weekly construction meeting on September 7, 2011. Items discussed included Safety, <br />Environmental, Schedule, QC documentation, and CQA. <br />We trust the information provided clearly represents our findings and observations for the week ending <br />September 10, 2011. <br />VLF Weekly Report WE 09.10.2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.