My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-10-06_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2011-10-06_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:30 PM
Creation date
10/12/2011 8:00:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
10/6/2011
Doc Name
Weekly Construction Quality Assurance ("CQA") Reports: Weeks of 9/10, 9/17, and 9/24/2011.
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
BMK
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ame0 <br />ATTACHMENT A <br />2011 CQA FIELD STAFF SCHEDULE FOR AMEC PERSONNEL <br />PHASE 5 VLF <br />Name <br />SEP 11 <br />SEP 12 <br />SEP 13 <br />SEP 14 <br />SEP 15 <br />SEP 16 <br />SEP 17 <br />Joseph Hickey <br />PR <br />PR <br />PR <br />PR <br />PR <br />PR <br />PR <br />Craig Thompson <br />LS <br />LS <br />LS <br />LS <br />LS <br />LS <br />LS <br />Uwe Kelley <br />ST <br />ST <br />ST <br />ST <br />ST <br />ST <br />ST <br />Robert Redd <br />GT <br />GT <br />GT <br />GT <br />GT <br />GT <br />- <br />Dustin Goto <br />GT <br />GT <br />GT <br />GT <br />GT <br />GT <br />GT <br />Eric Nargang <br />GT <br />GT <br />GT <br />GT <br />GT <br />- <br />- <br />Szu -Min Yang <br />- <br />- <br />- <br />ST <br />ST <br />ST <br />ST <br />Ben Melly <br />LG <br />LG <br />LG <br />LG <br />LG <br />LG <br />LG <br />Kevin Duarte <br />ST <br />ST <br />ST <br />ST <br />ST <br />ST <br />ST <br />Alyssa Wagner <br />GT <br />GT <br />GT <br />GT <br />GT <br />GT <br />- <br />Andy Ratz <br />LT <br />LT <br />LT <br />LT <br />LT <br />LT <br />LT <br />Jay Moore <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />Kim Morrison <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />*Night Shift <br />LEGEND <br />Engineer <br />VLF Weekly Report WE 09.17.2011 <br />PS = Project Sponsor <br />PCE = Project Certifying Engineer <br />PM = Project Manager <br />PR = Project Resident <br />LS = Lead Soils Engineer <br />LG = Lead Geosynthetics <br />ST = Soil Technician <br />LT = Laboratory Technician <br />GT = Geosynthetics Technician <br />FLM= Field/Laboratory Manager <br />SE = Senior Engineer <br />
The URL can be used to link to this page
Your browser does not support the video tag.