My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-09-08_REVISION - M1977342 (35)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977342
>
2011-09-08_REVISION - M1977342 (35)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:43:02 PM
Creation date
10/12/2011 7:59:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977342
IBM Index Class Name
REVISION
Doc Date
9/8/2011
Doc Name
Additional Copies of 2010 Documents
From
Climax Molybdenum
To
DRMS
Type & Sequence
TR14
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Allen Sorenson - DRMS <br />March 22, 2010 <br />Page 2 <br />requirement. CMC will continue to collect data to fulfill this requirement and assure that proper capacity is <br />maintained in the tailing facility to completely contain the design storm events. <br />Upon review and approval, CMC requests that DRMS send written approval of the upgraded facility as- <br />builts as referenced in Rule 7.3 and also send acknowledgement that TR -14 Stipulation No. 1 has been <br />fulfilled. <br />Please contact me at (303) 569 -3221, ext. 1204 or Miguel Hamarat (ext. 1233) if you have any questions <br />or concerns with this assessment or approach. <br />Sincerely, <br />Bryce Romig <br />Environmental Manager <br />Climax Molybdenum Company <br />Enclosures: <br />1. Tailing Pond Hydrology Report <br />2. Barge System Certifications <br />3. Project Summary Reports <br />4. Hydrostatic Test Results <br />5. Barge Return Pipeline As -built Drawings <br />6. Barge Stability Report <br />7. Barge As -built Drawings <br />CC: M. Hamarat, Climax <br />
The URL can be used to link to this page
Your browser does not support the video tag.