7.5 weeks. Repairs to and cleaning of the water bypass systems after the flood would be a <br />high priority that would require equipment and manpower. Activities after the flood would also <br />involve close monitoring of the impoundment. It is expected that production or operation of <br />the mill would have to cease for some period after the design storm, until water levels return <br />to normal operating conditions. <br />This analysis is based on scenarios and assumptions associated with an operating <br />site. The flood protection system will require re-evaluation when considering the post - <br />operations phase of the Henderson Mill facilities. <br />19 <br />