Laserfiche WebLink
September 26, 2011 C- 1981 - 014 /Southfield Mine JHB <br />RECLAMATION SUCCESS - Rule 4.15, Rule 3: <br />Vegetation on the reclaimed portal area and refuse pile look stable and in good condition. No bare areas <br />were identified from the aerial images, nor were there any problem areas identified. <br />SUPPORT FACILITIES - Rule 4.04: <br />The coal loading tunnel remains as a permanent structure to support the post- mining land use of <br />Rangeland and wildlife habitat. The tunnel is planned to be used for equipment or material storage. A small <br />graveled parking lot also remains on the reclaimed portal area at the request of one of the surface owners. <br />ENFORCEMENT ACTIONS /COMPLIANCE <br />No enforcement actions were taken as a result of this inspection. <br />Number of Partial Inspection this Fiscal Year: 3 <br />Number of Complete Inspections this Fiscal Year: 1 <br />Page 3 of 5 <br />