Laserfiche WebLink
Prince Albert Mine Plan of Operations Table of Contents <br />5.0 RECLAMATION PLAN 19 <br />5.1 Post Mining Land Use 19 <br />5.2 Reclamation Timetable 19 <br />5.3 Site Locations Affected by Toxic or Deleterious Materials 20 <br />5.4 Location Specific Reclamation 20 <br />5.5 Reclamation of Ventilation Shaft(s) 20 <br />5.6 Dismantling and Removal of Structures 21 <br />5.7 Mine Access Road Reclamation 21 <br />5.8 Vegetation Growth Medium Placement 21 <br />5.9 Seeding and Mulching 21 <br />5.10 Weed Control 22 <br />5.11 Re- vegetation Monitoring and Corrective Actions 22 <br />5.12 Reclamation Costs 23 <br />6.0 INTERIM MANAGEMENT PLAN 24 <br />6.1 Stabilize Excavations and Workings 24 <br />6.2 Storage or Removal of Equipment, Supplies and Structures 24 <br />6.3 Measures to Isolate or Control Toxic or Deleterious Materials 25 <br />6.4 Maintenance of the Project Area 25 <br />6.5 Monitoring Site Conditions during Periods of Non - operation 25 <br />6.6 Closure Schedule and Reporting 25 <br />7.0 SURFACE EXPLORATION DRILLING 26 <br />7.1 Surface Exploration Drilling Method 26 <br />7.2 Reclamation of Exploration Disturbances 27 <br />7.3 Surface Exploration Program State Agency Review and Approval 27 <br />List of Figures and Attachments <br />Figure 1 General Location Map Section 2.0 <br />Figure 2 Existing Site Map Section 3.0 <br />Figure 3 Mine Site Plan Map Section 4.0 <br />Figure 4 Reclamation Plan Map Section 5.0 <br />Attachment 1 Exhibit U Environmental Protection Plan (EPP) <br />from DRMS Limited Impact 110(d) Mining Reclamation Permit Application <br />Rimrock Exploration and Development ii <br />