Laserfiche WebLink
RIO GRANDE <br />SILVER,, INC. <br />sawj wsilver M%wEw61 jalwt ve h re <br />September 23, 2011 <br />Bob Oswald <br />Colorado Department of Natural Resources <br />-Division of Reclamation, Mining and Safety <br />Durango Field Office <br />691 CR 233, Suite A -2 <br />Durango, CO 81301 <br />CAMS&IED aV ER i-E" ) <br />RE: TR -17 Revision to Borrow Area #1, Pond #2 <br />Dear Mr. Oswald, <br />Construction of the temporary Holding Pond #1 began on Thursday September <br />21 When stripping the growth medium over the BORROW AREA #1 it was <br />discovered that the mounded area designated for berm material is in fact mill <br />tails. See Attached Pond #2 Plan Map with Revised BORROW AREA #1. <br />In order to not delay construction, I have designated a revised borrow area west <br />of, and adjacent to, the original BORROW AREA #1. The revised borrow area <br />encompasses .33 acres and will be cut at the same, or slightly lower, angle of <br />existing topography. Reclamation will be done as specified in the Technical <br />Revision — 17. Any additional bond costs will be submitted immediately upon <br />request. <br />Regards, <br />R onficC i u1ti1, <br />Randy McClure <br />Project Manager <br />Rio Grande Silver, Inc. <br />hardrockenterprises@,gmail.com <br />970 - 946 -0111 <br />112 East 12'" Street P.O. Box 610 Creede, CO 81130 <br />719- 658 -1080 Fax 719- 658 -1082 <br />n ECGo � 2 r''? <br />OC10 720 11 <br />Division or reclamation, <br />Mining and Safety <br />