Laserfiche WebLink
RIO GRANDE <br />SILVER ,, I N C . <br />Sei inj u.C4 Si.LVer Minivvg,oiwt vewture <br />September 23, 2011 <br />Bob Oswald <br />Colorado Department of Natural Resources <br />Division of Reclamation, Mining and Safety <br />Durango Field Office <br />691 CR 233, Suite A -2 <br />Durango, CO 81301 <br />RE: TR -17; Revision to Borrow Area #1, Pond #2 <br />Yin - - Zt <br />Dear Mr. Oswald, <br />Construction of the temporary Holding Pond #1 began on Thursday September <br />21 When stripping the growth medium over the BORROW AREA #1 it was <br />discovered that the mounded area designated for berm material is in fact mill <br />tails. See Attached Pond #2 Plan Map with Revised BORROW AREA #1. <br />In order to not delay construction, I have designated a revised borrow area west <br />of, and adjacent to, the original BORROW AREA #1. The revised borrow area <br />encompasses .33 acres and will be cut at the same, or slightly lower, angle of <br />existing topography. Reclamation will be done as specified in the Technical <br />Revision - 17. Any additional bond costs will be submitted immediately upon <br />request. <br />Regards, <br />R cievicc i MCCL <br />Randy McClure <br />Project Manager <br />Rio Grande Silver, Inc. <br />hardrockenterprises@gmail.com <br />970- 946 -0111 <br />RECEPSLM <br />OCT 07 2011 <br />Division of Reclamation, <br />Mining and Safety <br />112 East 12` Street P.O. Box 610 Creede, CO 81130 <br />719 -658 -1080 Fax 719 -658 -1082 <br />,2 R. & Cows— LEjTE Z <br />SEP <br />29 20/1 <br />ci � s ra n 90 <br />M ining a jar 7a � e <br />Safet ° <br />