My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-10-06_REVISION - M1980244 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2011-10-06_REVISION - M1980244 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:43:51 PM
Creation date
10/6/2011 2:08:45 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
10/6/2011
Doc Name
Submittal- LOB Liner System Enhancements and VLF Ph 4c Berm Raise.
From
CC&V
To
DRMS
Type & Sequence
TR62
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 02200 <br />Earthworks <br />G. Soil Liner Fill <br />ame <br />measurements have been approved by MANAGER and CERTIFYING ENGINEER and <br />will backfill holes with Low Volume Solution Collection Fill. Areas with deficient <br />thickness shall be reworked by CONTRACTOR, until acceptable measurements are <br />obtained. If MANAGER or CERTIFYING ENGINEER suspects the occurrence of any <br />damage to the underlying geosynthetics, MANAGER will instruct CONTRACTOR to <br />remove Low Volume Solution Collection Fill to expose the geosynthetics. <br />CONTRACTOR shall uncover, repair any observed damage of the underlying <br />geosynthetics, in accordance with the repair requirements of Sections 02776.0 and 02777.0 <br />of these SPECIFICATIONS and recover, at no cost to CC &V. <br />12. CONTRACTOR will provide adequate illumination as approved by MANAGER, if Low <br />Volume Solution Collection Fill placement is carried out at night. A minimum of 2 -foot <br />candles measured at the synthetic liner, shall be used when Low Volume Solution <br />Collection Fill placement is carried out at night. <br />1. Soil Liner Fill shall be placed within the limits of the valley leach facility as shown on the <br />DRAWINGS and shall begin only after completion of all, or MANAGER and <br />CERTIFYING ENGINEER approved portion of, excavation and Structural Fill <br />placement in the valley leach facility. <br />2. CONTRACTOR shall process, place and compact the Soil Liner Fill to achieve a <br />coefficient of permeability of less than 1xle cm/sec, measured according to ASTM <br />Method D5084, Method D. Any Soil Liner Fill not meeting the permeability specification <br />shall be removed and replaced with material meeting the permeability specification, at no <br />additional cost to CC &V. <br />3. CONTRACTOR shall place and compact the Soil Liner Fill in loose lifts such that the <br />compacted lift thickness is a minimum of 12- inches. <br />4. CONTRACTOR shall compact the Soil Liner Fill to at least 95 percent of the maximum <br />dry density as determined by the Standard Proctor density test (ASTM D698). The <br />moisture content shall be within +3% to -2% of the optimum moisture content. Both <br />moisture and density shall be uniform throughout the lift. If the Soil Liner Fill cannot be <br />conditioned to meet the placement specifications, the material shall be removed and <br />replaced with new Soil Liner Fill at the CONTRACTOR's expense. The <br />CONTRACTOR shall reduce the clod size of the soil liner fill to a size that is acceptable to <br />the CERTIFYING ENGINEER, the method by which will be approved by <br />CERTIFYING ENGINEER and MANAGER prior to implementation. <br />5. The moisture content of the Soil Liner Fill shall be uniform throughout prior to and during <br />compaction of the material. CONTRACTOR shall be responsible for meeting moisture <br />content and compaction SPECIFICATIONS. If the Soil Liner Fill cannot be conditioned to <br />meet the placement SPECIFICATIONS, the material shall be removed and replaced with <br />new Soil Liner Fill at no additional cost to CC &V. MANAGER may require <br />CONTRACTOR to moisture condition Soil Liner Fill at stockpile at least 24 hours prior to <br />the Soil Liner Fill being placed. <br />6. CONTRACTOR shall place Soil Liner Fill to form a continuous monolithic material. If a <br />lift of compacted Soil Liner Fill dries out during placement operations, CONTRACTOR <br />shall scarify, moisture condition the dry soil and recompact the lift. If a lift of compacted <br />S: Projects \1125G Squaw Gulch Valley Leach Facililty Design \I - Tech Specs \02200.r0.doc <br />Page 13 of 18 January 14, 2011 <br />Revision 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.