Laserfiche WebLink
Section 02200 <br />Earthworks <br />D. Underdrain Fill <br />ame <br />of passes shall be subject to CERTIFYING ENGINEER's approval, at no additional cost <br />to CC &V. The method SPECIFICATIONS may be changed at any time, at the discretion <br />of CERTIFYING ENGINEER, based upon changes in material characteristics, field <br />conditions, and/or compaction equipment. <br />1. Underdrain Fill shall be placed in the Underdrains as shown in the DRAWINGS. <br />2. CONTRACTOR shall condition Underdrain Fill that results in a firm, unyielding surface <br />capable of allowing the movement of vehicles and equipment over the surface without <br />causing rutting or other deleterious effects. <br />3. CONTRACTOR shall condition, place and compact Underdrain Fill by a method <br />compaction technique. The compaction equipment shall consist of a minimum 10 -ton <br />(static drum weight) vibratory smooth -drum compactor. The number of passes and loose <br />lift thickness shall be subject to CERTIFYING ENGINEER's approval, at no additional <br />cost to CC &V. The method SPECIFICATIONS may be changed at any time, at the <br />discretion of MANAGER, based upon changes in material characteristics, field conditions, <br />and/or compaction equipment. <br />4. Provisions shall be made by CONTRACTOR for removal of oversize materials from fills, <br />at no additional cost to CC &V. <br />5. The MANAGER will minimize the amount of traffic over the Underdrain Fill. <br />E. Leak Detection Fill <br />1. Leak Detection Fill shall be placed in the Leak Detection Trenches as shown on the <br />DRAWINGS. <br />2. CONTRACTOR shall condition Leak Detection Fill to allow a surface that does not cause <br />rutting or other deleterious effects. <br />F. Low Volume Solution Collection Fill <br />1. Low Volume Solution Collection Fill shall be placed over the geomembrane in the locations <br />shown on the DRAWINGS. <br />2. CONTRACTOR shall condition Low Volume Solution Collection Fill to allow a surface <br />that does not cause rutting or other deleterious effects. <br />3. CONTRACTOR shall place Low Volume Solution Collection Fill around the Low <br />Volume Solution Collection Vertical Riser Pipes in maximum 12 -inch loose lifts and <br />compact using a hand operated vibratory plate compactor to the satisfaction of the <br />MANAGER and CERTIFYING ENGINEER. Low Volume Solution Collection Fill <br />shall be worked under the Low Volume Solution Collection Rise pipe haunches by hand to <br />provide uniform support of the pipe. <br />4. Prior to placing the Low Volume Solution Collection Fill, CONTRACTOR shall verify by <br />visual inspection that the underlying geosynthetics are free of holes, tears, wrinkles, or <br />foreign objects. MANAGER and CERTIFYING ENGINEER will inspect the <br />S: \Projects \1125G Squaw Gulch Valley Leach Facililty Design \I - Tech Specs \02200.r0.doc <br />Page 11 of 18 January 14, 2011 <br />Revision 0 <br />