My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-10-06_REVISION - M1980244 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2011-10-06_REVISION - M1980244 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:43:51 PM
Creation date
10/6/2011 2:08:45 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
10/6/2011
Doc Name
Submittal- LOB Liner System Enhancements and VLF Ph 4c Berm Raise.
From
CC&V
To
DRMS
Type & Sequence
TR62
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.04 EXCAVATION: <br />Section 02200 <br />Earthworks <br />ame <br />A. CONTRACTOR shall perform excavation to the lines and grades shown on the DRAWINGS or as <br />directed by MANAGER. No excavation shall begin until the CONTRACTOR has provided <br />construction staking for the proposed work. <br />B. CONTRACTOR shall prevent the disturbance of surrounding areas during excavation. Where <br />selective excavations are required to obtain materials for Structural Fill and Select Structural Fill, the <br />material removed from the excavations shall be taken directly to the fill areas or, if required, <br />stockpiled by material types. The stockpiles shall be approved by MANAGER. <br />C. CONTRACTOR shall grade all excavations to ensure grades are maintained to provide adequate <br />drainage at all times. Work shall be suspended by CONTRACTOR when, in the opinion of <br />MANAGER and CERTIFYING ENGINEER, the site is overly wet, muddy, or otherwise <br />unsuitable for proper maintenance, until directed otherwise by MANAGER, at no cost to CC &V. <br />D. In excavations where Structural Fill or Select Structural Fill is to be placed on slopes steeper than <br />3H:1 V, horizontal benches shall be excavated into the slope to allow fill to be placed in horizontal <br />lifts. The CONTRACTOR shall continuously bench and key embankment material into the existing <br />material a minimum of 2 feet. <br />E. The CONTRACTOR will be responsible for the safety of temporary construction slopes. <br />CONTRACTOR shall inspect all temporary and permanent open -cut excavations on a regular basis <br />for signs of instability. Should signs of instability be noted, CONTRACTOR shall immediately <br />undertake remedial measures and shall notify MANAGER immediately. Permanent cut slopes shall <br />be left in smooth, safe, and stable condition at the end of the workday. <br />F. CONTRACTOR shall final grade excavations within the valley leach facility to establish positive <br />drainage to the Pregnant Solution Storage Area. In no case will depressions or bowls be permitted in <br />the valley leach facility area. <br />G. CONTRACTOR shall conduct all excavation and shoring operations in compliance with applicable <br />MSHA, Colorado State and Federal government laws and regulations. <br />3.05 SUBGRADE: <br />A. The MANAGER and CERTIFYING ENGINEER will inspect and approve the exposed subgrade <br />prior to any fill or Soil Liner being placed. CQA Monitor will confirm that the surface of the <br />subgrade is smooth and free of debris, grade stakes, angular rocks, roots, branches, vegetation, mud, <br />ice, or frozen material. If the subgrade is determined to be frozen, using the criteria identified in Item <br />3.06.10 of Section 2200, the CONTRACTOR may either remove and replace the frozen subgrade <br />or wait until subsequent temperature monitoring indicates the fill is unfrozen, at no cost to CC &V. <br />The subgrade shall have no sudden sharp or abrupt changes in grade. <br />B. CONTRACTOR is responsible for maintaining subgrades in a condition satisfactory to <br />CERTIFYING ENGINEER. CONTRACTOR shall protect prepared subgrades, including <br />previously approved subgrade, from weather, construction equipment, or other factors as outlined in <br />Part 3.06 of the SPECIFICATIONS. Subgrade surfaces, including previously approved subgrade, <br />that become softened or otherwise unsuitable for placement of fill, shall be repaired to <br />CERTIFYING ENGINEER's and MANAGER's satisfaction, at no cost to CC &V. <br />S:\Projects \1125G Squaw Gulch Valley Leach Facililty Design \I - Tech Specs \02200.r0.doc <br />Page 7 of 18 January 14, 2011 <br />Revision 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.