My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-10-06_REVISION - M1980244 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2011-10-06_REVISION - M1980244 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:43:51 PM
Creation date
10/6/2011 2:08:45 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
10/6/2011
Doc Name
Submittal- LOB Liner System Enhancements and VLF Ph 4c Berm Raise.
From
CC&V
To
DRMS
Type & Sequence
TR62
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
U.S. Standard <br />Sieve Size <br />Percent Passing <br />by Dry Weight <br />' -inch <br />100 <br />% -inch <br />40 — 70 <br />No. 4 <br />5 — 50 <br />No. 40 <br />0 — 20 <br />No. 200 <br />0 —10 <br />U.S. Standard <br />Sieve Size <br />Percent Passing <br />by Dry Weight <br />1 -inch <br />100 <br />' -inch <br />40 — 70 <br />No. 4 <br />5 — 55 <br />No. 200 <br />0 —10 <br />U.S. Standard <br />Sieve Size <br />Percent Passing <br />by Dry Weight <br />2 -inch <br />100 <br />No. 200 <br />15 — 65 <br />Section 02200 <br />Earthworks <br />Plasticity Index: <br />Plasticity Index: <br />Plasticity Index: <br />Hydraulic Conductivity <br />S: \Projects \1125G Squaw Gulch Valley Leach Facililty Design \I - Tech Specs \02200.r0.doc <br />0 <br />0 <br />10 minimum <br />1 x 10 cm/s maximum <br />ame <br />4. Leak Detection Fill - material approved by MANAGER and CERTIFYING ENGINEER <br />conforming to the following SPECIFICATION: <br />5. Low Volume Solution Collection Fill and Bedding Fill - material approved by MANAGER <br />and CERTIFYING ENGINEER conforming to the following SPECIFICATION: <br />6. Soil Liner Fill - processed materials as approved by MANAGER and CERTIFYING <br />ENGINEER, conforming to the following SPECIFICATION: <br />Page 3 of 18 January 14, 2011 <br />Revision 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.