2011-10-06_REVISION - M1980244 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2011-10-06_REVISION - M1980244 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:43:51 PM
Creation date
10/6/2011 2:08:45 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
10/6/2011
Doc Name
Submittal- LOB Liner System Enhancements and VLF Ph 4c Berm Raise.
From
CC&V
To
DRMS
Type & Sequence
TR62
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.03 GCL PLACEMENT <br />amee <br />A. GCL rolls should be delivered to the working area of the site in their original packaging. Immediately <br />prior to deployment, the packaging should be carefully removed without damaging the GCL. The <br />orientation of the GCL should be in accordance with the design DRAWINGS, or <br />MANUFACTURER recommendations if not otherwise specified. Packaging waste shall be disposed <br />of daily into landfill or dumpster as designated by OWNER. <br />B. Equipment, which could damage the GCL, shall not be allowed to travel directly on it. If the <br />installation equipment causes rutting of the subgrade, the subgrade must be restored to its originally <br />accepted condition before placement continues. <br />C. Care must be taken to minimize the extent to which the GCL is dragged across the subgrade in order <br />to avoid damage to the bottom surface of the GCL. A temporary geosynthetic subgrade covering <br />commonly known as a slip sheet or rub sheet may be used to reduce friction damage during <br />placement. <br />D. The GCL panels shall be placed parallel to the direction of the slope. <br />E. All GCL panels should lie flat on the underlying surface, with no wrinkles or folds, especially at the <br />exposed edges of the panels. <br />F. Only as much GCL shall be deployed as can be covered at the end of the working day with soil, a <br />geomembrane, or a temporary waterproof tarpaulin. The GCL shall not be left uncovered overnight. <br />If the GCL is hydrated when no confining stress is present, it may be necessary to remove and replace <br />the hydrated material. The GCL supplier should be consulted for specific guidance if premature <br />hydration occurs. <br />G. When a textured geomembrane is installed over the GCL, a temporary geosynthetic covering known <br />as a slip sheet or rub sheet should be used to minimize friction during placement to allow the textured <br />geomembrane to be more easily moved into its final position. <br />H. Although direct vehicular contact with the GCL is to be avoided, lightweight, low ground pressure <br />vehicles such as four -wheel all- terrain vehicles (ATVs) may be used to facilitate the installation of <br />any geosynthetic material placed over the GCL. The GCL MANUFACTURER or CQA Monitor <br />should be contacted with specific recommendations on the appropriate procedures in this situation. <br />L Soil cover, where applicable, shall be placed in a manner that prevents the soil from entering the GCL <br />overlap zones. Cover soil shall be pushed up slopes, not down slopes, to minimize tensile forces on <br />the GCL. <br />3.04 EARTHWORKS <br />A. Any earthen surface upon which GCL is installed shall be prepared and compacted in accordance with <br />the SPECIFICATIONS and DRAWINGS. The surface shall be smooth, firm, and unyielding, and <br />free of vegetation, construction debris, sticks, sharp rocks, void spaces, ice, abrupt elevation changes, <br />standing water, cracks larger than one - quarter inch (0.25 in) in width, and any foreign matter that <br />could contact the GCL. <br />B. Immediately prior to GCL deployment, the subgrade shall be fmal- graded to fill in all voids or cracks <br />and then smooth- rolled to provide the best practicable surface for the GCL. Prior to smooth- rolling, <br />moisture shall be applied to the surface of the subgrade by a water truck or other means approved by <br />Section 02776.2 Page 5 of 7 September 15, 2011 <br />Geosynthetic Clay Liner (GCL) Revision 0 <br />S: \Projects \1125E CCV COA \H2 - Design \ LOB_ Liner _September2011 \02776.2.r0.doc <br />