Application for Reclamation Permit - Schmidt Site - M- 2011 -014 Exhibits P. 18
<br />(d) ALL roads and buildings will remain after "reclamation" of this construction
<br />project. No ponds or streams are planned. Wildlife habitat is not part of the
<br />proposed future land use.
<br />• (e) All ditches, sediment control facilities, and other features except topsoil
<br />stockpiles established during the construction will remain after "reclamation" of
<br />this construction project. Infiltration swales and basins, and ditches with check
<br />dams and other erosion and sediment control features are intended to meet
<br />requirements to prevent or minimize disturbance to the hydrologic balance.
<br />Retaining walls, slope stabilization measures, riprap (armoring of slopes), and
<br />revegetation are intended to prevent off -site damage and provide for a stable
<br />configuration consistent with the proposed long -term land use.
<br />RECLAMATION COST ESTIMATE FOR ALTERNATE B
<br />UNIT COSTS BY ACTIVITY Quantity per acre done
<br />Backfilling from stockpiles (berms) Dozer $150 /hr @ 16 hrs
<br />(including disassembling core)
<br />Grading and contouring
<br />Scarification and final contouring
<br />Gravel (Class I)
<br />Revegetation
<br />GENERAL SITE WORK
<br />LOCATION Notes
<br />Lower Driveway
<br />Upper Driveway
<br />House Pad
<br />Mobilization
<br />WHERE NEEDED
<br />0.999 acres total
<br />Area(SF) ACTIVITY Unit $ Cost Mark -up Total $
<br />Final work, gravel 6,500 Backfilling from stockpiles (berms) $ 2,400 $ 358 15% $ 412
<br />6,500 Grading and contouring $ 660 $ 98 15% $ 113
<br />3,131 Scarification and final contouring $ 425 $ 31 15% $ 35
<br />3,032 Graveling $ 6,921 $ 482 15% $ 554
<br />3,131 Revegetation $ 1,200 $ 86 15% $ 99
<br />0 Backfilling from stockpiles (berms) $ 2,400 $ - 15% $ -
<br />14,496 Grading and contouring $ 660 $ 220 15% $ 253
<br />1,333 Scarification and final contouring $ 425 $ 13 15% $ 15
<br />11,846 Graveling $ 6,921 $ 1,882 15% $ 2,165
<br />1,333 Revegetation $ 1,200 $ 37 15% $ 42
<br />Shelter Cove (no roof) Slopes and out- 7,000 Backfilling from stockpiles (berms) $ 2,400 $ 386 15% $ 444
<br />door storage area 7,000 Grading and contouring $ 660 $ 106 15% $ 122
<br />5,500 Scarification and final contouring $ 425 $ 54 15% $ 62
<br />1,500 Graveling $ 6,921 $ 238 15% $ 274
<br />5,500 Revegetation $ 1,200 $ 152 15% $ 174
<br />Final work, gravel 5,130 Backfilling from stockpiles (berms) $ 2,400 $ 283 15% $ 325
<br />5,130 Grading and contouring $ 660 $ 78 15% $ 89
<br />466 Scarification and final contouring $ 425 $ 5 15% $ 5
<br />5,130 Graveling $ 6,921 $ 815 15% $ 937
<br />466 Revegetation $ 1,200 $ 13 15% $ 15
<br />10,400 Backfilling from stockpiles (berms) $ 2,400 $ 573 15% $ 659
<br />10,400 Grading and contouring $ 660 $ 158 15% $ 181
<br />10,400 Scarification and final contouring $ 425 $ 101 15% $ 117
<br />991 Graveling $ 6,921 $ 157 15% $ 181
<br />5,443 Revegetation $ 1,200 $ 150 15% $ 172
<br />$ 1,200 15% $ 1,380
<br />Contract $ 7,674 $ 1,323 $ 8,825
<br />BOND ESTIMATE $ 8,825
<br />Mark -up includes all DRMS fees and charges, broken out per item, total is $1323
<br />Prepared by Nathan A. Barton, PE - based on local equipment and material costs.
<br />Parking /Loading Area Slopes and no
<br />significant walls
<br />around parking
<br />Final work, gravel
<br />and lawn /garden
<br />(assume no slab)
<br />Skidloader $55 /hr @ 12 hrs
<br />Tractor $85 /hr @ 5 hrs
<br />4 -in ABC Class I: 692 T @$10/T
<br />Seed $200/$100, Sow $600, Mulch $300
<br />$ /acre
<br />$ 2,400
<br />$ 660
<br />$ 425
<br />$ 6,921 Delivered and placed
<br />$ 1,200 including 50% reseeding
<br />DALE AND ELLEN SCHMIDT, 472 Meadows Drive, Pagosa Springs, CO 81147, (970) 946 -6262