My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-09-30_REVISION - P2008059
DRMS
>
Day Forward
>
Revision
>
Prospect
>
P2008059
>
2011-09-30_REVISION - P2008059
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:35:04 AM
Creation date
10/5/2011 2:16:28 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2008059
IBM Index Class Name
REVISION
Doc Date
9/30/2011
Doc Name
Updated Modification application (form 2) MD-02
From
Energy Fuels Resources Corporation
To
DRMS
Type & Sequence
MD2
Email Name
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 (FORM 2 - Public filing) <br />8. Describe the estimated topsoil depth and how topsoil will be salvaged, stockpiled and redistributed for the re- establishment of <br />vegetation. Specify approximate topsoil redistribution depth: <br />Soil depth is zero to a few feet. Any soil removed in site preparation or pits will be bermed <br />and used to cover pits and cuttings during reclamation at depths approximately equal to <br />pre - disturbance. Any compactea areas wnere soil is not removes will be scarifiea during <br />reclamation. <br />All disturbed areas will be seeded <br />9. Describe how drill holes will be plugged (refer to Rule 5.4 of the Rules for required abandonment procedures): <br />Holes will be back filed with cuttings to about 7 ft below surface. Five feet of concrete or <br />expanding foam will be placed as a plug. The remaining hole will be filled with native <br />material. If any ground water is encountered (none expected), bentonite pellets will be <br />used to form a plug to prevent migration of water in the hole. <br />10. Describe how portals, adits, shafts, ponds, excavations, or other disturbances will be reclaimed (refer to Rule 3 and Rule 5 for <br />specific reclamation performance standards). You may wish to contact the Division for closure specifications. <br />N/A <br />11. Describe how roads will be reclaimed or returned to their pre - prospecting (or better) condition: <br />Compacted soils in old roads used to access new holes will be scarified. Any removed <br />brush and limbs will be scattered on any roads no longer needed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.