My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-10-03_REPORT - M1977436 (4)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1977436
>
2011-10-03_REPORT - M1977436 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2020 3:41:32 PM
Creation date
10/5/2011 11:42:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977436
IBM Index Class Name
REPORT
Doc Date
10/3/2011
Doc Name
Annual Report and Map
From
Aggregate Industries
To
DRMS
Permit Index Doc Type
Annual Fee/Report
Email Name
DB2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CERTIFIED MAIL <br />RETURN RECEIPT NO. 7010 0780 0001 2876 1000 <br />September 30, 2011 <br />Mr. Jim Dupler <br />Division of Reclamation, Mining and Safety <br />1313 Sherman Street, Room 215 <br />Re: Permit No. M- 1977 -436, Brighton Mine - 112c Annual Report and Map <br />Denver, CO 80203 <br />Dear Jim: <br />Enclosed is the annual report form and a drawing for the report year ended August 28, 2011 for the <br />above - referenced permit. During the permit year ended August 28, 2011, mining continued in the central <br />reservoir cell and mining of the entire site has now been completed. The aggregate processing plant, <br />located in the northwestern portion of the site, remains for processing of previously excavated material. <br />Processed material stockpiles remain within the central cell and northwest area of the project while sales <br />and the reclamation phase of mining activity continue. <br />Sloping of all phases of mining has been completed, and grading of the floors of the south and central <br />reservoir cells has been completed. The north pond continued to be backfilled with overburden and wash <br />fines during permit year ended August 28, 2011. Reclamation activity projected for the current permit <br />year includes seeding around the reservoir cells and additional backfilling and grading in and around the <br />north pond area. <br />Leak tests for the slurry wall that was constructed in 2007 have been conducted by TetraTech. The south <br />cell reservoir lining was approved by the Colorado Division of Water Resources on August 19, 2010 and <br />the central cell reservoir lining was approved by that agency on June 9, 2011. Copies of the approval <br />letters will be submitted with a request for bond reduction by separate letter. <br />Thank you for advising that the check for the annual fee was sent directly to the Division from Aggregate <br />Industries' accounts payable department and for faxing a copy to me. For reference, I am enclosing a <br />copy of that check (No. 532214 in the amount of $791.00). <br />If you have any questions or need additional information, please call me at (970) 396 -5252. <br />Very truly yours, <br />4P/z/isa 4g/elev <br />Connie N. Davis <br />Land Advisor <br />Enclosures <br />Aggregate Industries <br />West Central Region, Inc. <br />1707 Cole Blvd., Suite 100 <br />Golden, CO 80401 <br />Telephone: 303 - 985 -1070 <br />Connie N. Davis, Land Advisor <br />P. O. Box 337231, Greeley, CO 80633 <br />Phone: (970) 396 -5252 <br />431 <br />RocEnro <br />�OCT 0 3 2011 <br />Division of Reclamation, <br />Mining and Safety <br />AGGREGATE <br />INDUSTRIES <br />An Equal Opportunity Employer <br />
The URL can be used to link to this page
Your browser does not support the video tag.