Laserfiche WebLink
Affected Lands <br />Exhibit A <br />April 27, 2011 <br />Figure C -4 & <br />Attachment 2 <br />September 9, 2011 <br />Changes in Acreage <br />May Day 1 <br />3.5 <br />3.56 <br />+0.06 <br />May Day East <br />0.5 <br />0.97 <br />+0.47 <br />May Day 2 <br />3.3 <br />3.72 <br />+0.42 <br />May Day 3 (Lamb) <br />3.2 <br />3.31 <br />+0.11 <br />Idaho Mill Site <br />3.1 <br />8.38 <br />-0.22 <br />Payday Mill Site <br />5.1 <br />Included w /Idaho <br />Included w /Idaho <br />Augmentation Pipeline <br />0.4 <br />Included w /Idaho <br />Included IN/Idaho <br />Chief Portal <br />0.3 <br />0.81 <br />+0.51 <br />La Plata Bridge <br />0.1 <br />0.1 <br />0 <br />Base of Operations <br />1.0 <br />0.95 <br />-0.05 <br />Exploration Drilling <br />15.8 <br />0 <br />-15.8 <br />Pre - existing Roads <br />9.5 <br />8.92 <br />-0.58 <br />New Access Road <br />1.8 <br />2.36 <br />+0.56 <br />Affected Land Totals <br />47.6 <br />33.08 <br />-14.52 <br />Affected Lands <br />Figure C -4 & <br />Attachment 2 <br />Exhibit A & <br />Exhibit E <br />Survey Maps <br />May Day 1 <br />3.56 <br />3.56 <br />3.44 <br />May Day East <br />0.97 <br />0.97 <br />No Survey Map <br />May Day 2 <br />3.72 <br />3.72 <br />3.31 <br />May Day 3 (Lamb) <br />3.31 <br />3.14 <br />Boundary Unique <br />Idaho & Payday <br />8.38 <br />8.38 <br />Chief Portal <br />0.81 <br />0.98 <br />No Survey Map <br />La Plata Bridge <br />0.1 <br />0.1 <br />No Survey Map <br />Base of Operations <br />0.95 <br />0.95 <br />No Survey Map <br />Pre - existing Roads <br />8.92 <br />17.7 <br />All Roads Not Included <br />New Access Road <br />2.36 <br />4.73 <br />1.76 (previous survey) <br />Affected Land Totals <br />33.08 <br />44.23 <br />Sixth Adequacy Letter, Amended CN -01 <br />May Day Idaho Mine Complex, M- 1981 -185 <br />Table 2: Contradictions in Affected Land Acreage, September 9, 2011 <br />Therefore, there is an 11.15 acre contradiction regarding affected land acreages in the <br />application materials received on September 9, 2011. <br />If the Division were to assume the acreages provided in the revised Exhibit A and E are correct, <br />resulting in a total 44.23 acres, then an amendment to CN -01 is required for the approximate <br />12 acres increase in affected lands, as illustrated above in Table 1. If the Division were to <br />assume the acreages provided in the revised Figure C -4 and Attachment 2 are correct, resulting <br />in a total 33.08 acres, then an amendment to CN -01 is required for the approximate two acres <br />increase in affected lands, as illustrated below in Table 3. <br />Table 3: Additions of Affected Lands from April 27 to September 9, 2011 <br />3 <br />