Laserfiche WebLink
MINE ENGINEERING <br />MINE RECLAMATION <br />September 30, 2011 <br />Daniel Hernandez <br />Division of Reclamation, Mining and Safety <br />1313 Sherman St., Room 215 <br />Denver, CO 80203 <br />Re: New Elk Mine Permit C -1981 -012 <br />Technical Revision No. 59 NOV CV- 2011 -003 <br />Dear Mr. Hernandez: <br />J. E. STOVER & ASSOCIATES INC. <br />2352 NORTH 7` STREET, UNIT B <br />GRAND JUNCTION, COLORADO 81501 <br />PHONE: (970) 245 -4101, FAX 242 -7908 <br />Qr'' <br />pivit and Satety <br />CIVIL ENGINEERING <br />CONST. MANAGEMENT <br />The DRMS' e-mail dated September 28, 2011 transmitted its adequacy response for the referenced <br />technical revision. On behalf of New Elk Coal Company (NECC) following are its responses to the <br />DRMS' comments and concerns. <br />1. DRMS - Based on a review of the approved Map 13 in the PAP, the proposed disturbance area <br />runoff of the addition requested in TR59 is not delineated. Please have New Elk discuss the <br />manner in which the proposed disturbed area runoff will be collected and treated. <br />NECC - The C & W train shop, 10 stall garage and other associated structures are located on the <br />west side of the east mine sedimentation control system. The land slopes approximate 2% from <br />the C & W train shop to the east towards pond 7. Flow from this general area will be collected in <br />either ditch D -5 or D -6 and will be conveyed to sediment pond 7. The forth paragraph on page <br />2.05 -10 was inserted to explain this issue. <br />2. DRMS - Regarding proposed revised pages 2.05 -27, 2.05 -27a, and 2.05 -6a (Table 19), proposed <br />revised Map 11 -Sheet 3, and proposed revised Exhibit 28, please have New Elk revise these <br />materials to remove references to the 200' fixed conveyor, the 500' temporary conveyor, and <br />demolition and mob /demo associated with the radial stacker pads and conveyor footings. It's my <br />understanding that these pieces of equipment will be addressed via Minor Revision MR97, which <br />the Division is also currently reviewing. <br />NECC - Please withdraw pages 2.05 -27 and 2.05 -27a from further consideration in this technical <br />revision. These two pages only describe the refuse conveyors and are included in MR -97. <br />Enclosed are amended Table 19 and Map 11 -Sheet 3. <br />3. DRMS - The Division has compiled a reclamation cost estimate for the tasks associated with the <br />reclamation of the C &W Train Shop Facilities Area. This estimate is sufficient to reclaim all <br />areas associated with the proposed addition of facilities under TR59. Based on discussions with <br />New Elk, the proposed 200 ft fixed conveyor, 500 ft temp. conveyor and demolition work <br />associated with the radial stacker pads and conveyor footings will be bonded under Minor <br />Revision MR97. As such, those tasks have not been included in the Division's cost estimate. New <br />Elk submitted a reclamation cost estimate in the amount of $158, 716, which included those tasks <br />