Laserfiche WebLink
QUARTERLY SEDIMENTATION POND INSPECTION REPORT <br />Mine: New Elk <br />NPDES ID. No.: Pond #1 <br />Inspection Period: Third Quarter 2011 <br />Inspection Date: 09/30/11 <br />EMBANKMENT <br />1). Adequacy of the vegetative cover. <br />2). Erosion forming Gullies: <br />3). Is wave action causing erosion: <br />On the Upstream embankment? <br />At the principal spillway inlet? <br />PRINCIPAL SPILLWAY <br />fO ou,D h /. i/USA <br />1). Is the principal spillway system in working order? <br />CDMR Rule 4.05.9(17) <br />General Description or Reference to Site Plan: <br />This Pond lies West of the Industrial Building and serves as a mine water settleing and water <br />storage pond. <br />Excellent <br />4). Erosion of the downstream toe of the embankment? <br />Cause of erosion can be attributed to: <br />Extensive Some Few <br />Yes <br />Yes <br />5). Is seepage occurring through the dam? Yes <br />Could this seepage cause potential instability? <br />Few Poor <br />Yes No li <br />Yes v <br />No U <br />No <br />2). Is the inlet free of debris and restrictive material? Yes V No <br />3). Is the discharge outlet free of restrictive material? Yes t.- <br />- No <br />4). Is erosion occurring at the discharge outlet?. Yes No <br />Evaluate the severity: Extensive Moderate Just starting None <br />