Laserfiche WebLink
QUARTERLY SEDIMENTATION POND INSPECTION REPORT <br />Mine: New Elk RDA Containment SW <br />NPDES ID. No.: None <br />Inspection Period: Third Quarter 2011 <br />Inspection Date: 09/30/11 <br />General Description or Reference to Site Plan: <br />This partially incised containment basin is a non - discharging facility designed to contain run -off <br />from the area west of the RDA belt conveyor and south of highway 12. <br />EMBANKMENT <br />1). Adequacy of the vegetative cover: <br />2). Erosion forming Gullies: <br />3). Is wave action causing erosion: <br />On the Upstream embankment? <br />CDMR Rule 4.05.9(17) <br />Excellent Moderate <br />Extensive Some None <br />Yes <br />4). Erosion of the downstream toe of the embankment? Yes <br />Cause of erosion can be attributed to: <br />5). Is seepage occurring through the dam? <br />Could this seepage cause potential instability? <br />SEDIMENT STORAGE CAPACITY <br />Explain: <br />OTHER OBSERVATIONS: <br />MSHA Qualified Impoundme <br />- 3° - ; © /I <br />Date <br />1). Has the design storage capacity of the reservoir been surpassed? <br />Yes No <br />f VI e...(11.600 S 4 e <br />Poor <br />Yes No <br />No f <br />No L- <br />