My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-10-03_GENERAL DOCUMENTS - C1996083
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1996083
>
2011-10-03_GENERAL DOCUMENTS - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:43:37 PM
Creation date
10/4/2011 9:35:43 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
10/3/2011
Doc Name
Pond J and Irrigation Run-off
From
J.E. Stover & Associates, Inc
To
DRMS
Permit Index Doc Type
General Correspondence
Email Name
JJD
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINE ENGINEERING <br />MINE RECLAMATION <br />September 29, 2011 <br />J. J. Dudash <br />Division of Reclamation, Mining & Safety <br />1313 Sherman St., Room 215 <br />Denver, CO 80203 <br />Re: Bowie Resources, LLC, Bowie No. 2 Mine <br />Pond J and Irrigation Run -off <br />Permit C- 1996 -083 <br />Dear Mr. Dudash: <br />The DRMS has expressed concerns about irrigation run -off that is collected in Pond J <br />since the run -off calculation for Pond J did not consider irrigation return flows. The <br />volume of irrigation return flow is relatively minor. Pond J has excess capacity in the <br />form of sediment capacity. The required sediment capacity is 0.16 AF. The as -built <br />sediment capacity is 0.91 AF. The irrigation run -off could be allowed to flow into pond J <br />until the pool of water reaches the as -built sediment elevation of 5850 (Ref Map No. 22- <br />J). At that point additional irrigation water accumulation would reduce the pond's <br />design water capacity. <br />Bowie proposes to install survey stakes around the inside of the pond at the maximum <br />sediment elevation (5850). Bowie will monitor the pond during the irrigation season to <br />assure the level of the irrigation water does not exceed the maximum sediment level. <br />Should the water level be exceeded, Bowie will discharge the excess water. <br />Sincerely, <br />J. E` "Stover, P.E. <br />Consulting Engineer <br />Cc: Bill Bear <br />J. E. STOVER & ASSOCIATES, INC. <br />2352 NORTH 7 STREET, UNIT B <br />GRAND JUNCTION, COLORADO 81501 <br />PHONE: (970) 245 -4101, FAX 242 -7908 <br />RECEIVED <br />OCT 0 3 2011 <br />Division Q1 , ci amation, <br />Mining and Safety <br />CIVIL ENGINEERING <br />CONST. MANAGEMENT <br />
The URL can be used to link to this page
Your browser does not support the video tag.