Laserfiche WebLink
The Division of Reclamation, Mining and Safety has proposed the decision stated below. Provided there <br />are no objections, the decision will become effective upon the termination of the ten (10) day public <br />comment period, in accordance with Rule 2.08.4(6)(b)(iii). <br />Technical Revision No. 127 Decision: Approve <br />Submittal Date: July 27, 2011 Decision Date: September 30, 2011 <br />Description of Revision: Revised RPE East Refuse Pile Design to Include Colluvium and an <br />Underdrain <br />REVISED INFORMATION <br />APPLICATION PAGES MAPS/EXHIBITS <br />Replace Entire Contents of Exhibit 82 <br />CHANGE IN <br />ACREAGE <br />Disturbed: 0.00 <br />Affected: 0.00 <br />Permit: 0.00 <br />State: 0.00 <br />Federal: 0.00 <br />Private: 0.00 <br />Date: <br />COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br />1313 Sherman Street, Room 215, Denver, Colorado 80203, (303) 866 -3567 <br />COAL MINING PERMIT - TECHNICAL REVISION DECISION <br />West Elk Mine, Mountain Coal Company, LLC <br />Permit No. C- 1980 -007 <br />REVISED <br />TOTAL ACREAGE <br />Disturbed: <br />Affected: <br />Permit: <br />State: <br />Federal: <br />Private: <br />Authorized Represseentat've <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />599.45 <br />15,257.60 <br />17,154.90 <br />0.00 <br />11,758.40 <br />5,396.50 <br />PERFORMANCE BOND <br />Prior Liability: <br />Change in Liability: <br />Revised Liability <br />Bond Held <br />$15,303,401.71 <br />$0.00 <br />$15,303,401.71 <br />$15,000,000.00 <br />C- TR- 09_ C1980007_TAK_10032011073400.doc <br />