Laserfiche WebLink
Task description: <br />Site: Blair Mesa Pit <br />PROJECT IDENTIFICATION <br />Task #: <br />Date: <br />User: <br />Cost Breakdown: <br />02A <br />9/27/2011 <br />THM <br />Spread Topsoil <br />Agency or organization name: <br />HOURLY EQUIPMENT <br />Material weight: <br />Material description: <br />Rated Payload: <br />Payload Capacity: <br />DRMS <br />- Scraper: <br />- Dozer: <br />Support Equipment -Load Area: <br />-Dump Area: <br />Road Maintenance —Motor Grader: <br />-Water Truck: <br />Scraper Work Team <br />SCRAPER TEAM WORK <br />Permit Action: SI -01 <br />State: Colorado <br />County: Rio Blanco <br />Equipment Description <br />Cat 637G <br />Cat D7R DS Series II - 7SU <br />NA <br />NA <br />NA <br />NA <br />COSTShift basis: 1 per day <br />Sunnort Eauinment <br />Page 1 of 2 <br />Permit/Job #: M1996082 <br />Abbreviation: None <br />Filename: M082 -02a <br />Maintenance Eauinment <br />Total work team cost/hour: $1,282.14 <br />MATERIAL QUANTITIES <br />Initial volume: <br />Loose volume: <br />24,200 <br />24,200 <br />Source of estimated volume: <br />Source of estimated swell factor: <br />HOURLY PRODUCTION <br />1,600 lbs /LCY <br />Top Soil <br />75,000 pounds <br />46.88 LCY <br />CCY <br />LCY <br />Cat Handbook <br />Swell factor: 1.000 <br />Division of Reclamation, Mining & Safety <br />Scraper Bowl (volume) Basis: <br />Struck Volume: <br />Heaped Volume: <br />Average Volume: <br />Adjusted Capacity: <br />24.00 <br />34.00 <br />29.00 <br />29.00 <br />LCY <br />LCY <br />LCY <br />LCY <br />CIRCES Cost Estimating Software <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />100 <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$80.72 <br />$43.55 <br />NA <br />NA <br />NA <br />NA <br />Operating cost/hour: <br />$178.12 <br />$64.94 <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$24.95 <br />$38.49 <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$283.79 <br />$146.98 <br />NA <br />NA <br />NA <br />NA <br />Number of Units: <br />4 <br />1 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: <br />$1,282.14 <br />Support: <br />$0.00 <br />Maint: <br />$0.00 <br />Task description: <br />Site: Blair Mesa Pit <br />PROJECT IDENTIFICATION <br />Task #: <br />Date: <br />User: <br />Cost Breakdown: <br />02A <br />9/27/2011 <br />THM <br />Spread Topsoil <br />Agency or organization name: <br />HOURLY EQUIPMENT <br />Material weight: <br />Material description: <br />Rated Payload: <br />Payload Capacity: <br />DRMS <br />- Scraper: <br />- Dozer: <br />Support Equipment -Load Area: <br />-Dump Area: <br />Road Maintenance —Motor Grader: <br />-Water Truck: <br />Scraper Work Team <br />SCRAPER TEAM WORK <br />Permit Action: SI -01 <br />State: Colorado <br />County: Rio Blanco <br />Equipment Description <br />Cat 637G <br />Cat D7R DS Series II - 7SU <br />NA <br />NA <br />NA <br />NA <br />COSTShift basis: 1 per day <br />Sunnort Eauinment <br />Page 1 of 2 <br />Permit/Job #: M1996082 <br />Abbreviation: None <br />Filename: M082 -02a <br />Maintenance Eauinment <br />Total work team cost/hour: $1,282.14 <br />MATERIAL QUANTITIES <br />Initial volume: <br />Loose volume: <br />24,200 <br />24,200 <br />Source of estimated volume: <br />Source of estimated swell factor: <br />HOURLY PRODUCTION <br />1,600 lbs /LCY <br />Top Soil <br />75,000 pounds <br />46.88 LCY <br />CCY <br />LCY <br />Cat Handbook <br />Swell factor: 1.000 <br />Division of Reclamation, Mining & Safety <br />Scraper Bowl (volume) Basis: <br />Struck Volume: <br />Heaped Volume: <br />Average Volume: <br />Adjusted Capacity: <br />24.00 <br />34.00 <br />29.00 <br />29.00 <br />LCY <br />LCY <br />LCY <br />LCY <br />CIRCES Cost Estimating Software <br />