Laserfiche WebLink
Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />O la <br />02a <br />03a <br />04a <br />Highwall Reduction <br />DOZER <br />•--- N ---i .-r <br />9.85 <br />$1,525.11 <br />$14,340.85 <br />$56,647.50 <br />$6,805.96 <br />Spread Topsoil <br />SCRAPER1 <br />11.19 <br />Revegetate 30 acres <br />REVEGE <br />24.00 <br />Mobilization <br />MOBILIZE <br />6.00 <br />SUBTOTALS: <br />51.04 <br />$ $79,319.42 <br />Task description: <br />Site: Blair Mesa Pit <br />PROJECT IDENTIFICATION <br />Task #: <br />Date: <br />User: <br />001 <br />9/27/2011 <br />THM <br />Agency or organization name' <br />TASK LIST (DIRECT COSTS) <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: <br />Performance bond: <br />Job superintendent: <br />Profit: <br />COST SUMMARY <br />Permit Action: SI -01 <br />State: Colorado <br />County: Rio Blanco <br />DRMS <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />2.02 Total = <br />1.05 Total = <br />25.52 Total = <br />10.00 Total = <br />TOTAL 0 & P = <br />CONTRACT AMOUNT (direct + O & P) = <br />Financial warranty processing (legal/related costs): 500.00 <br />Engineering work and/or contract/bid preparation: 0.00 <br />Reclamation management and/or administration: 5.00 <br />CONTINGENCY: 3.00 <br />Permit/Job #: M1996082 <br />Abbreviation: None <br />Filename MO82 -001 <br />Total = <br />Total = <br />$1,602.25 <br />$832.85 <br />$1,494.45 <br />$7,931.94 <br />$11,861.49 <br />$91,180.91 <br />500.00 <br />$0.00 <br />$4,559.05 <br />Total = $2,379.58 <br />TOTAL INDIRECT COST = $19,300.12 <br />TOTAL BOND AMOUNT (direct + indirect) = $98,619.54 <br />