My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-09-30_PERMIT FILE - P2011018
DRMS
>
Day Forward
>
Permit File
>
Prospect
>
P2011018
>
2011-09-30_PERMIT FILE - P2011018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:43:35 PM
Creation date
10/4/2011 7:31:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2011018
IBM Index Class Name
PERMIT FILE
Doc Date
9/30/2011
Doc Name
Response to reclamation notice deficiencies
From
Gault Group LLC
To
DRMS
Email Name
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
September 16, 2011 <br />G,dULT GROUP LLC <br />Mr. John Murphy, District Ranger <br />USDA Forest Service, Gunnison Ranger District <br />216 North Colorado Street <br />Gunnison, CO 81230 <br />Subject: Supplemental lnformation <br />Dear Mr. Murphy: <br />As a follow -up to our meeting in your office on September 14 Gault Group, LLC is pleased to <br />provide the following supplemental information relative to the proposed Tomichi Resources Plan <br />of Operations (PoO). <br />The attached three figures have been developed to address questions raised during the meeting. <br />The figures illustrate typical configuration of equipment on the staging area, typical layout of the <br />drilling equipment during operation, and the road segments to be re- closed following drilling. <br />The figure depicting road re- closure also includes the location of the primary water tank. The <br />revised point of diversion for the water rights application is: NAD 83, Northing 4269677, <br />Easting 0381951, Zone 13 South <br />The sound panels discussed in the meeting are not included in a figure. Three sound panels will <br />be utilized. Two steel panels, each measuring 8'x14', are mounted on the long sides of the <br />drilling platform, much like the sides on a stake -bed truck. A third panel, measuring 8'x8' is <br />mounted on the end of the platform opposite the drill head. These panels form a "U" shaped <br />structure around three sides of the diesel engine. <br />With regard to the total amount of fluids stored on -site, we are requesting that the 200 gallon <br />quantity included in the PoO be changed to 50 gallons. Maximum diesel capacity in the <br />equipment is 50 gallons, and maximum hydraulic fluid capacity is 40 gallons. Spill prevention <br />measures utilized during refueling entail placement of heavy plastic on the ground where <br />refueling occurs. The plastic is covered with 2'x2'x3/8" absorbant mats. Should spills occur <br />36 West Main Street G Cortez, CO 81321 9 Ph 970.565.1222 Fx 970.565 -1226 <br />www.gaultgroup.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.