My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-09-29_PERMIT FILE - P2011030
DRMS
>
Day Forward
>
Permit File
>
Prospect
>
P2011030
>
2011-09-29_PERMIT FILE - P2011030
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:43:30 PM
Creation date
10/3/2011 1:28:37 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2011030
IBM Index Class Name
PERMIT FILE
Doc Date
9/29/2011
Doc Name
New NOI application form 2
From
Silver Star Resources
To
DRMS
Email Name
RCO
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11. Describe proposed surface excavation or other land disturbance, including roads, pits, trenches, waste piles, drill pads and <br />collar areas of underground workings, ponds, etc... <br />There will be 46 holes drilled using 21 locations and one escapeway shaft. Only existing dirt (rock) roads will be used to access the <br />_ 1 I . • • • • <br />area of approximately 420 feet length. It is planned to drive over this area with the rig and reseed it once the work is finished. Very <br />• <br />mine access. This shaft will produce approximately 4590 tons of inert rock waste that will be placed on the existing waste rock pile at <br />the mine portal area. bee map 1 Tor tnis area. i ne new land disturbance at me snaft site is planned to be no more tnan u.t acre in size <br />since most of this area is already disturbed and contains waste rock piles from old mining. <br />12. Proposed Disturbance (approximate) Describe the proposed drilling to be conducted, including anticipated number of holes, <br />diameter, depth, location, etc... Submit additional pages if necessary: <br />A. <br />B. <br />C. <br />Drill Pads: Quantity 22.00 <br />Drill Holes: Quantity 46.00 <br />Mud Pits: Quantity 22.00 <br />Average Depth 1.00 (f <br />4 (FORM 2 - Public filing) <br />Average Width 30.00 (ft) Average Length 90.00 (ft) <br />Depth 22,000.00 (ft) Diameter 2.16 (in) <br />Average Width 4.00 (ft) Average Length 4.00 (ft) <br />Described proposed underground work, including reopening of old workings, advancement of adits or shafts, <br />trenches, pits, cuts, rock dumps, or other types of disturbance, describe type, quantity and general dimensions: <br />See Discussion #1 and Table 1. <br />F. Other Disturbances (please describe): <br />All existing roads will be used for all drill sites except for the 420 feet of road as described in F <br />below. See Table 1 for the breakdown of surface disturbance for each drill location. The <br />main Revenue Mine adit and will he placed on the existing waste rock pile which is already <br />fully disturbed. <br />G. Indicate Chemicals and Fuels used or stored on site. List type, quantity and method to store. <br />Diesel will be brought to the site as needed by truck. None will be stored on site. <br />F. New Road(s): Length 420.00 (ft) Width 14.00 (ft) <br />Significantly Upgraded Road(s) Length n nn (ft) Width n nn (ft) <br />Are culverts or other crossings proposed? If so, please describe: <br />See Discussion 2. <br />
The URL can be used to link to this page
Your browser does not support the video tag.