Laserfiche WebLink
THE LAKEWOOD BRICK & TILE, COMPANY. <br />DOUGHTY'S PIT - M 975 <br />2011 ANNUAL REPORT <br />SEPTEMBER 26, 201 1 <br />9. Continued from page 1 <br />PAGE 2 <br />The brown area is where mining (1.85 ac) is taking place, the orange area is stockpile /loadout <br />area (0.65 ac) and the yellow area is equipment storage (0.50 ac). A 1.0 ac. Portion of the <br />3.10 acres disturbed to date is stripped ready for mining. In July 2010 the mine was inspected <br />and the bond was increased to $8,385.00 on September 13, 2010. <br />